# Add and manage views

See the same board as a table, a list, a kanban, a timeline or a calendar, and keep the tabs in the order your team actually uses.

Source: https://support.rework.com/article/add-and-manage-views

One board, many ways to look at it. A project manager wants the whole list with dates and owners, a designer wants a kanban of what's in review, and the client call needs a timeline. **Views** are tabs on a board that show the same tasks in different layouts, each with its own grouping, filters and columns. Changing a view never changes the tasks, so everyone can keep the view that suits them.

> **Note:** Adding, renaming, hiding and deleting views is for people who can manage the project. Everyone on the project can switch between the views that are shown.

## Step 1: Find the view tabs

Open a board. The tabs next to the board name are its views. A **Tasks** board starts with **Table**, **List**, **Board**, **Timeline** and **Calendar**. Click a tab to switch, and click **+** at the end of the strip to add a view.

![The view tab strip on a Tasks board with the Add view button](https://storage.googleapis.com/reworkv3-public/success/260923/baKzjoBBOXe3KNeVSIroKCVodvw8sA81GovOu5uI2eCmcRkcOiXTqcbHan02Wa0U/img.zHktqSm7L73Sxc9nEYtYbdSG8YYXn8x031OmJ5dAsWRQTR6t3LrKpBtpTleeZ1HL.png)

## Step 2: Add a view

In the **Add view** dialog:

- **View name**: what the tab says, for example _Design review_.
  
- **Type**: how the view lays out the tasks:
  

| Type | Shows tasks as |
| --- | --- |
| **Table** | Rows and columns, like a spreadsheet |
| **List** | A compact list grouped into sections |
| **Board** | Kanban columns you drag cards between |
| **Timeline** | Bars on a calendar, with dependencies. See [Timeline view](https://support.rework.com/article/timeline-view) |
| **Calendar** | Tasks on their dates in a month or week grid. See [Calendar and assignment views](https://support.rework.com/article/calendar-and-assignment-views) |
| **Assignments** | Tasks gathered under each person |
| **Workloads** | Booked effort per person over time |
| **People** | The team with the work each person holds |
| **Allocate** | Effort to spread across people and dates |

- **Group by**: for a **Board** view, the column that buckets the cards, for example **Stage**, **Status**, **Priority** or **Assignee**.
  

Click **Add view**. The new tab opens straight away. Display options such as fields and colours come after, from **Customize view**. See [Filter, group and save a view](https://support.rework.com/article/filter-group-and-save-a-view).

![The Add view dialog with View name, Type, Group by and the Add view button](https://storage.googleapis.com/reworkv3-public/success/260923/HtncUdBtOMmx560bbK0PxjWOOqYdF5LpBHAZYYLm1KjJ2MlzdFBJNoUFCdHeMpkA/img.DaLbeWy0Du4qnCbncDpDGQukuDcIdl8PmkwDHd3OIZ2SUAFiAT9JnABI2OZEXOmI.png)![The new Design review view open as a board grouped by assignee](https://storage.googleapis.com/reworkv3-public/success/260923/qXViXjDYULGycyQTCw9pwwUMs4Lzeozn2Wx9fY6ptB02FWeFLDo0DJbiUzWY382H/img.xUQN809rXRi0saQg7fOU5FAooQIAlL2aTh9pgzS77kNGPwG9ashv9VTJwbfHolwd.png)

## Step 3: Use the view menu

Click **•••** on the active tab to open **View actions**:

- **Set as default**: make this the tab the board opens on. The current default shows **Default view** instead.
  
- **Duplicate view**: copy the view with its settings, then change the copy.
  
- **Rename**: change the tab name. Only for views you added.
  
- **Hide view**: remove the tab from the strip without deleting it. The default view can't be hidden.
  
- **Delete view**: remove a view you added. The built-in views can be hidden but not deleted.
  

![The View actions menu on the Design review tab](https://storage.googleapis.com/reworkv3-public/success/260923/gmIchNuaFkmBm7PLf1DE1ubdogm5ofg6MP9Rk2MuNsohCfNA0xg0HMJZ3uqXeCeO/img.yDlEnZyQQhaZf1Yc31F13tGYn18MoYiSrKmYfqpjZxAzZPpygeZZqOkC7IM2FDNp.png)

## Step 4: Arrange all views at once

Open **Board actions** (**⋯** at the top right of the board) and click **Manage views**. The dialog lists every view in one order:

- Drag a row by its handle to move the tab in the strip.
  
- Click the star to make a view the default.
  
- **Rename** and **Delete** appear on views you added. Built-in views show **Built-in**.
  
- Use the switch on each row to show or hide the tab.
  

![Manage views with the drag handles, the default star, rename and delete, and the show switches](https://storage.googleapis.com/reworkv3-public/success/260923/Pl4sUIuZKuNTMgA6lVUyEL9L6kDsh5mavhSgIzuGrAPOyvml3P00pPOMp41X3ysl/img.0xxAGBjmU8fbj4Qwy5o6zBXGDJwcvsxUsjoifOoKdlIIvyODFZ9ehEnJ2EP7q6Iu.png)

At the bottom:

- Turn on **Always show the default (starred) view first in the tab strip** to pin the default tab to the front, whatever the order.
  
- Click **Add view** to add another tab from here.
  
- Click **Done** to close.
  

![The default-first switch, Add view and Done at the bottom of Manage views](https://storage.googleapis.com/reworkv3-public/success/260923/ZFHbQsN5Sp0YfwlCj1SevZtElqqj4HV2yjHM54GCWTNostYXlw14LnX6sKAksuws/img.einX2JF05UrEEC0OZ2yZb6SggqExtBUI4Hufej7pdikB5Ge0U9PhChCdxhdCkxkh.png)

> **Note:** The default view can't be hidden. Want to hide it? Star another view first. 💡