# Calendar and assignment views

See tasks on the days they happen, find the ones with no date yet, and check who is holding which work.

Source: https://support.rework.com/article/calendar-and-assignment-views

Some questions are about days: what lands this week, and is anything due on the day of the client workshop? Others are about people: who's overloaded, and who has nothing active? The **Calendar** view answers the first by placing each task on its dates. The **Assignments** and **People** views answer the second by gathering the board's tasks under each person.

## Step 1: Open the Calendar

Open a board and click the **Calendar** tab. Each task is a bar from its start date to its deadline, coloured by its stage. Then use the toolbar:

- **Month** and **Week**: switch between the month grid and a single week.
  
- The arrow and **Today**: step to the previous or next period, or jump back to the current one.
  
- **No date**: shows how many tasks have neither a start date nor a deadline. It only appears when there are some.
  

![The Calendar in Month mode with the Month and Week switch, the navigation and the No date button](https://storage.googleapis.com/reworkv3-public/success/260923/YryVevNWTs2MS6J6msBgXyrS6OSvEQ2qzRUMUI0th78lIgZzS7NxC3cRvKytorsK/img.VsIb1f9yTEpJXUT2IBBOW2VdLG3QAA8TyOhC9vNMpXbtdpptoOzoTW8Lx1OQb0Yf.png)

## Step 2: Schedule tasks that have no date

Click **No date** to open the list of undated tasks on the right, and use **Type to search** to find one. Click a task to open it and set its dates. Close the panel with **×** or by clicking **No date** again.

![The No date panel listing Brand launch press kit](https://storage.googleapis.com/reworkv3-public/success/260923/ddIN4f3o8SEXOGHeiUmCK6tJv2t2jWiWYBLKkrSGyFDjZImjtz9KgzHzdslr0hT7/img.Zc9s61BLuRbjEeeBIm39Rn0vODl9bfXuaseYSKtDWWO0y30BNp6Lu2HqIqcb93Rn.png)

## Step 3: Zoom in on a week

Click **Week**, then **Today**, to see the current week on its own. Tasks spread across the week the same way, with more room for long names. Click a task to open it and change its dates.

![The Calendar in Week mode with a task bar marked](https://storage.googleapis.com/reworkv3-public/success/260923/SgF80o2kXggA0elsk7MqK1UDbCxQftv4XBRUuby1TuIRTPRfulLryjAVcYGci23o/img.o0or40UDJk8bCXKHZf9RAf6nSx7zRrdm63gIYYjTwb0rlckBK5ElWdK2qu3mGYVZ.png)

## Step 4: Choose how the calendar looks

Click **Customize view**. Under **DISPLAY** and **SHOW**:

- **Color by**: what the bar colour means: **Stage**, **Status** or **Assignee**.
  
- **Max items per day**: how many tasks a day cell shows before it collapses the rest into **+N more**.
  
- **Weekends**: show or hide the Saturday and Sunday columns.
  

Save the view to keep these settings for everyone. See [Filter, group and save a view](https://support.rework.com/article/filter-group-and-save-a-view).

![The Customize view panel for a calendar with Color by, Max items per day and Weekends](https://storage.googleapis.com/reworkv3-public/success/260923/WtTq3pWNPiR4qi5naAvvsu0q51Kqp1gZhNG4WN2ZmHLkiVy69atr15nFzkM9JQB0/img.uA2nOsFbihiIXSgLNNPEYoOsJQEVKZfp1DtPQQJa74TS3TI2C54Jk4GNGZwk22EP.png)

## Step 5: See the work per person with Assignments

**Assignments** and **People** are built-in views that start hidden, so don't worry if you can't see them yet. To show them, open **Board actions** (**⋯**), click **Manage views** and turn on their switches. See [Add and manage views](https://support.rework.com/article/add-and-manage-views).

The **Assignments** view shows:

- **Workload** at the top: a bar per person, so an unbalanced team stands out.
  
- A card per assignee, plus **Unassigned**, with their number of items, a completion bar, and counts of **Draft**, **Active** and **Done** tasks.
  
- The tasks themselves, folded by status inside each card. Click a status to expand it.
  

![The Assignments view with the workload bars and a card per person](https://storage.googleapis.com/reworkv3-public/success/260923/HWOtLHALQG4p6xJdMSkxILhSJcrKczQzRliweD92nKP0mqKwoFOZYUK58RXIv6kj/img.5tYkBPeeXamXPvP6X5xxVogYHKUVeMpJtcs4AfA8Jd8rkDceaafvXQC0F7EAeWiu.png)

## Step 6: See who is involved with People

The **People** view lists everyone with a role on the board's tasks. Each card shows whether the person is an **Assignee**, a **DRI** or both, how many tasks they're assigned, how many they're accountable for, and how many are done.

![The People view with a card for Helen, Jolie, Eric and Harry](https://storage.googleapis.com/reworkv3-public/success/260923/yDDQQYy3q4vVoOTC49jjqHWCKAn4Z32a1tvOx2p7J1aHfFtbkyIDa8VFJJoKhSNC/img.4jYRn1zIUqsahlopXf7qSNozqwe4fZs2yIgbiwoS6Mp4PghReBLYnafvwuwR6d9H.png)

## Workloads and Allocate

The board can also show two views for planning effort, turned on the same way from **Manage views**:

- **Workloads**: the effort booked for each person over time.
  
- **Allocate**: spread a task's planned effort across people and dates.
  

Both work with workload bookings, cost rates and bill rates. See [Capacity and workload views](https://support.rework.com/article/capacity-and-workload-views) for the detail.