# Capacity and workload views

See how much work each person is carrying, spot the weeks that are over capacity, and check your own bookings.

Source: https://support.rework.com/article/capacity-and-workload-views

Bookings tell you what a project needs. Capacity tells you whether the people you have can actually deliver it. The workspace **Workloads** page puts every booking in the studio on one calendar, colours each day by how full it is, and lets you fix an overload by dragging work instead of rebuilding a spreadsheet. Here's how to read it, and where to find the same numbers per board and for yourself.

## Step 1: Open the workspace Workloads page

Click **Workloads** at the bottom of the left sidebar. The toggle at the top right switches between **Overview** and **Capacity**.

**Overview** answers "how much work is booked, and what state is it in":

- The tiles across the top give **RECORDED** hours, how many **PEOPLE** recorded time in the window, **AVG UTILIZATION** and **OVER ESTIMATE**, the count of entries above plan.
  
- **Workload pipeline** counts records and hours at each status, planned to booked to recorded.
  
- **Where the hours go** splits the same effort by workload type, and **Recent time entries** lists what was recorded last.
  

**Capacity** answers the other question: can the team fit it?

![The Workloads page on Overview, with the Overview and Capacity toggle, the stat tiles and the workload pipeline](https://storage.googleapis.com/reworkv3-public/success/260923/Heyxhs0mPeEym4kdi8OAZtsDmGH8qSA8wIp1rXTHAWeeDcIQLK9B1l74pfdDS9TX/img.gqP3UpjWY58RUim2RjEsMGJFh2Zy60SxlY0mYQW4McGux9isQwJFsCbpltODQ6Fv.png)

## Step 2: Read the capacity board

Switch to **Capacity**. Each row is a person, each column is a day.

- **Today** and the arrows move the window, and the range beside them tells you which days you're looking at.
  
- **No date** collects the bookings that have no dates yet, so they're never silently ignored.
  
- **Filters** narrows the board and holds the capacity settings.
  
- The legend gives the colours: **On track**, **Near capacity**, **Over** and **Non-working**.
  
- Each person's row shows how many items they hold, their daily average, and hours booked against hours available, for example _78h 51m / 120h_.
  
- **Show unscheduled** reveals the undated effort for that person, with how much it would add.
  

Expand a person to see their individual bookings as bars. Drag a bar to move the work, or drag its edge to resize it.

![The Capacity view with the date range, the No date button, Filters, the colour legend and an expanded person row](https://storage.googleapis.com/reworkv3-public/success/260923/2O1XIpgARmkw21rUIxmcjg44BerFNIdLcRSAcDbDTIrYt1Lpnd5xgtYq4kMPYdjR/img.EvhAD3BYkziDdzkmzjUlsCn2jMmdgK57tmIUcOMp87RPztNxjYq97Q7wXsAARlRz.png)

> **Note:** A day's fill is planned effort as a share of that day's real capacity, which is working hours minus time off. A solid red cell with no percentage is work booked on a non-working day.

## Step 3: Tune what the board counts

Open **Filters** to reach the capacity settings:

- **READ EFFORT FROM**: **By workload item** reads each booking on its own period and assignee. **By task** reads the effort on the tasks instead.
  
- **WORKLOAD ITEM STATUS**: limit the board to **Planned**, **Booked** or **Recorded**. Selecting none includes every live status, and cancelled records are never counted.
  
- **ROWS**: **Show unassigned row** adds one row at the bottom for work nobody is assigned to.
  
- **DISTRIBUTION**: **Spread over working days only** keeps effort on each person's working days. Turn it off and effort spreads across every calendar day, which puts load on weekends.
  

Click **Apply**.

![The capacity settings panel with Read effort from, Workload item status, Rows, Distribution and the Apply button](https://storage.googleapis.com/reworkv3-public/success/260923/kQCaj4xViS5tvfEgBypRhTpv05ejkjW1neoO18d7jI4EwmJEu4IZxjmu2vcDBuIN/img.ajdAiL1HY5vj3xDQbCGyAmqk98XUBHNYiIW6sPmJu6TXvr1qIwYqUa5cIGZAa9KI.png)

## Step 4: Set the working calendar

Capacity is only as honest as the working week behind it, and the week is set per person. Click the small calendar icon on someone's row to open **Working calendar**:

- **COMMON WEEKS** offers ready-made patterns: **Mon–Fri · 8h**, **Mon–Fri 8h + Sat morning 4h**, **Mon–Sat · 8h** and **Mon–Fri · 4h**.
  
- **HOURS PER DAY** sets each weekday individually. A **0** is a non-working day, and half days are allowed, so a Saturday morning is 4.
  
- The line underneath totals it up, for example _40h per week · 5 working days_.
  

Click **Save calendar**.

![The Working calendar dialog for Jolie with common weeks, hours per day and the Save calendar button](https://storage.googleapis.com/reworkv3-public/success/260923/z8BOkTNTakGyis5wNqnoVdZ5a1kBXiP3gkdUFhYPi89xJffLIr4ocnrF7MCio5Bd/img.vmBGBywuOpr9A0AeWeeSWUDXBTM2qnYIkTRLiOc08c5RIJIwM2RV9zosXCMs0H0i.png)

## Step 5: Open one person's page

Click a person on the capacity board to open their page:

- The card at the top gives their role and email, the hours they recorded in the **Last 12 weeks**, how many **Records** that came from, and a chip per workload type with the hours against it.
  
- The table underneath lists each **WORKLOAD**, the **WORK ITEM** it belongs to, the **TIME** on it and the date it was **RECORDED**.
  

Use it for a one-to-one, or to check whether someone who looks overloaded this week is actually finishing things.

![A person page with the profile card and the workload table](https://storage.googleapis.com/reworkv3-public/success/260923/n9ZwQm13GlGhyYQyaiDxplYvD8GrjhTSDyI8dNcmCfAGKCoMlI0IUsVpd1L2sabL/img.9Zq9yM5JlKuPDKGArzpIMrmkNauGjpm5bCpeOZMCtn1YyIbYvUnADN4X46OSl3Lu.png)

## Step 6: Check effort on a board

A board has its own views for the same question, scoped to one board's tasks. Open a tasks board and pick a view from the secondary tabs:

| View | What it answers |
| --- | --- |
| **Assignments** | Who is on each task. See [Calendar and assignment views](https://support.rework.com/article/calendar-and-assignment-views). |
| **Workloads** | Planned against actual effort, grouped by workload type. |
| **Allocate** | How tracked time has been spread across bookings, task by task. |

**Workloads** opens with the board's totals: **Planned**, **Actual** as a percentage of plan, and how many **Records** make it up. Under that, records are grouped by workload type with the planned effort per group, and a recorded row shows its plan, its actual and its status side by side.

![The board Workloads view with the planned and actual totals and records grouped by workload type](https://storage.googleapis.com/reworkv3-public/success/260923/Pr3AIKBamF0sM3bCf1GIgxjT1KScwFPdMQQevEoz1jJNdztXFdGHqjReH5OXrIoh/img.Qjtyzgolm7lxagSHUanY5oM2ayvsS6QzLfASlDBtC4iy55KuOYKZ1fajWdrmNSGg.png)

**Allocate** is the bulk version of [logging time to a workload](https://support.rework.com/article/track-time-and-log-it-to-workloads): every task on the board in one table, under **TASK**, **TRACKED**, **ALLOCATED** and **LEFT**, with a **Total** row at the bottom. A negative **LEFT** means more has been allocated to bookings than was ever tracked on the task.

![The board Allocate view with the tracked, allocated and left columns and the total row](https://storage.googleapis.com/reworkv3-public/success/260923/t6Ch30zwjJUkO6N9G6ynPwQ91LCc5sKk1ZC9hMXsb5yN4wz3SHgC21FMKD4Tx5ES/img.T2lWJZNqec4ebUhn2O5gUs8EyN6Y4ZxQlSR00CPD2JmnWx9TVCQ1RXYTmi4o6Ueu.png)

## Step 7: Check your own workloads

Open **My Works** and click **Workloads** for your own bookings only:

- The first card gives your **PLANNED EFFORT**, the share of it already recorded, and counts of **BOOKINGS**, **RECORDED** and **PROJECTS**.
  
- **BY PROJECT** splits that effort across the projects you're booked on.
  
- **SUMMARY** totals your planned effort, how many bookings are recorded, and the split between **Booked** and **Recorded**.
  

💡 This is the view to open before you say yes to one more thing.

![My Works Workloads with the planned effort card, the by project breakdown and the summary](https://storage.googleapis.com/reworkv3-public/success/260923/LxnfKZcBF0x5ErUw7jxsRBCy9mfB5LuKicLXO5FXZckrh1B34CagEDI6ZuDyAR5J/img.DkGig7pVf2uSbeCQUXiCNXZ6CKt0VdkS4NZOkdTYuq54I0qB3ZDEf2OT8QqG3ldi.png)

Effort that has been recorded is what turns into cost. See [Book workloads](https://support.rework.com/article/book-workloads) for the bookings behind these views, and [Read the P&L report](https://support.rework.com/article/read-the-pnl-report) for what they cost.