# Create a task

Add tasks to a board one at a time, in bulk from a pasted outline, or as sub-tasks under a parent.

Source: https://support.rework.com/article/create-a-task

A task is the smallest unit of work in Rework Projects. Everything else on a project (the timeline, the workload, the cost roll-up and the check-ins) is built from tasks, so the faster they get onto the board, the sooner the project can be read. There are three ways to add one, and each suits a different moment: the inline row while you're in the flow of planning, the **Add item** dialog when you already know the details, and a pasted outline when the plan exists somewhere else.

## Step 1: Open the task board

- Open a project and click its **Tasks** board in the left panel.
  
- Every view of the board can add a task. Two controls do it:
  
  - The **Add item** row at the bottom of each group, which files the task into that group.
    
  - The **Add Task** button in the toolbar, which opens the full form.
    

![The Tasks board with the Add item row and the Add Task button](https://storage.googleapis.com/reworkv3-public/success/260923/D059zwMkJTzsWCR73yRmcBb43In0Dn7nvEskbDEDI5FcYS00IywNckKV4yopjB7U/img.XnHup1ncBesvcLxsVEFwYESA2N5TNcBN0TeLw7mg4Rry9iugRaym5ScNUJKY6WNX.png)

## Step 2: Add a task inline

Click **Add item**, type a name and press Enter. The row stays open so you can type the next task straight away.

Before you press Enter, the four chips next to the name set the fields you'd otherwise have to reopen the task to fill in:

| Chip | Sets |
| --- | --- |
| **Add assignee** | The person who does the work |
| **Add dates** | The deadline, at the end of the day you pick |
| **Add priority** | Low, Medium, High or Critical |
| **Add tag** | The work type, for example Web page or Brand identity |

Click **Save** to create the task, or **Cancel** to drop it.

![The inline composer with a name typed and the assignee, priority and type chips set](https://storage.googleapis.com/reworkv3-public/success/260923/Bb0U2YahDTIxmKzin4JJWdxiDrgTiTPUYJBOG9Wa2mJejsLaudIiHJJrO7PwrFVk/img.36mLcyTdFJwZ7894OKK6XuQAvqY3sK3vRgi2YSvqfpSkTHqGL7sSxvZ1MwGxE2Jk.png)

Each chip opens its own small picker. The dates chip opens a calendar, and the day you choose becomes the deadline.

![The dates chip with the calendar open](https://storage.googleapis.com/reworkv3-public/success/260923/RKALjkDdzxBLEec2g8QRyCT4ZDcGqeCSxbzsvFMxKrXD0SeKVxFYYiBwmgZSNLGj/img.1XjJRLbXN4JF40soQ3Iz6R2MdIYN8mptsYHpbNEpgdp3gLHZGPjmpsZ3gjqH6hAR.png)

## Step 3: Add a task from the Add item dialog

Click **Add Task** in the toolbar when you want to fill in everything at once. Only **Name** is required.

- **Name**: what the task is, written as the action to take.
  
- **Type**: the kind of work, drawn from the work types your service defines.
  
- **Priority**: **None**, **Low**, **Medium**, **High** or **Critical**.
  
- **Group**: the section of the board the task files under. Leave it on **Ungrouped** to keep it out of the groups.
  

![The Add item dialog with Name, Type, Priority and Group](https://storage.googleapis.com/reworkv3-public/success/260923/4kYXFCtAZTSNoUMIyAlC4KMbUsQXkewiYydgVHzz6M5VYRaop72F7Rgv5G9MZmAg/img.B9iH9cnkkTpO5hQfu2Ve9W74kMV1Ynl7z2Zaq2NVBTQHSu739JYdcNEPfbuhC5pG.png)

- **Assigned to**: the person doing the work.
  
- **DRI (owner)**: the person accountable for the outcome. It can be someone other than the assignee.
  
- **Start date** and **Deadline**: both carry a time. A new deadline lands at the end of the day you pick.
  
- **Description**: the brief, written in a rich text editor.
  

Click **Create item**. If the service or the project requires custom fields on this type of task, they appear under the description and have to be filled in before the button turns on. See [Task details and custom fields](https://support.rework.com/article/task-details-and-custom-fields).

![The Add item dialog with people, dates, description and the Create item button](https://storage.googleapis.com/reworkv3-public/success/260923/i6WaJu9f74zjLSC2PIYJoKbmWxL7abUMdrkRNcG3m6bg8acLjHlv8piy08V5595S/img.q7NyE663lhXI2Uyw7zdjQen1iylD0BsvJ9AVOwvI9HJjrjCWYdkrcwfGyF4QTt9L.png)

## Step 4: Paste an outline to create many tasks at once

When the plan already exists in a spreadsheet, a document or a client brief, you don't have to retype it. 💡 Open the inline **Add item** row and paste the outline straight into the name box.

- Every line becomes a task.
  
- Indentation becomes hierarchy. One tab, or two spaces, is one level down.
  
- List markers such as `-`, `*`, `1.` and `1)` are stripped.
  
- A paste of more than 200 lines keeps the first 200 and tells you so.
  

For example, pasting this:

`Launch communications`  
    `Draft the announcement post`  
    `Brief the client team`  
    `Schedule the social posts`

creates one parent task with three sub-tasks under it.

![Four tasks created from a pasted outline, the parent expanded to show its three sub-tasks](https://storage.googleapis.com/reworkv3-public/success/260923/YMtTka9zIEcqnJFEGiYZwjUUxKnjjSevM1YbLdKMSxIwZEH1ee0LK5SLj2DUyETG/img.6H8wNJmRjKbLxA1sdVEIIAf7wKdpiwM4wVloaywj2ajRs4ZD7SFHEv37FBEIzE1n.png)

> **Note:** A single line of pasted text is treated as ordinary typing, not as an outline. The outline rules only apply when the text has more than one line.

## Step 5: Break a task into sub-tasks

Any task can hold sub-tasks. Click a task to open its side panel and use the **Sub-tasks** section.

- Click **+** and type a name, then press Enter to add another.
  
- Each sub-task row carries its own status circle, priority, assignee and due date.
  
- The header counts how many are done, for example **0/2 done**.
  

Sub-tasks are tasks in their own right, so they appear on the board, the timeline and the workload like any other. If the project reviews sub-tasks, they go through the same review. See [Complete a task and task review](https://support.rework.com/article/complete-a-task-and-task-review).

![The Sub-tasks section on a task's side panel](https://storage.googleapis.com/reworkv3-public/success/260923/GMrrEEs96Zbe1094UL8TUHQswK2llYyKZWuad7o1WCd5VuPgdVLulzpJftcVI51V/img.PV9tBbCrmgkwefON081JrBjMQ6MGAwVPLGljAjEFpP8oomjebDx8DfunITf3sjM9.png)

## Step 6: Group tasks into sections

Groups are the bands the board sorts tasks into, for example Discovery, Design, Development and Launch.

- Click the arrow next to **Add Task** and choose **Add Group**.
  

![The Add Task menu with Add Group](https://storage.googleapis.com/reworkv3-public/success/260923/cNj5dTruVQIogI8JOsdYEpxRpK4qrPtSVzUAHcm6pe9ZqfSsaSiltZT21Sv82NRA/img.6jNjVOJLxxu72CsZjmfeZ7Av8rcpNkafgxNdHlzZhuKdghCSeJlj0gDUDO0KsFND.png)

- Give the group a **Name** and pick a **Color**, then click **Create group**.
  

A group belongs to the project, not to one view. So a group made from the Table view also shows up on the Board, the Timeline and the Calendar, and the **Add item** dialog can file new tasks into it.

![The New group dialog](https://storage.googleapis.com/reworkv3-public/success/260923/9trkMgCfyYF5A3rPDZYQvQlibzcYdGtgTGWoQhm34wp2kBfmtPeT6gLPK1uRIkXa/img.q4dIC1mGgNl3ODxJftR38fpQg5bsbUOB3onRaU5WXJ37cR1fBNAwh51nChjQSKcj.png)

Your tasks are on the board! Next, fill in what each one needs in [Task details and custom fields](https://support.rework.com/article/task-details-and-custom-fields), or connect them in the right order with [Task dependencies](https://support.rework.com/article/task-dependencies).
