# Edit pipeline stages

Rename, reorder, add and remove the stages of a pipeline, and tune each stage's probability, rotting limit and color.

Source: https://support.rework.com/article/edit-pipeline-stages

Your sales process changes. A new qualification step appears, two stages turn out to be the same conversation, or deals sit too long in negotiation before anyone notices. Editing the stages keeps the board true to how your team actually sells, without rebuilding the pipeline or losing the deals already in it. Here's how to edit them.

> **Note:** You need to be a **pipeline owner**, an **App Admin** or the system **Owner** to edit stages.

## Step 1: Open the stage editor

There are two ways in, and both open the same editor:

- From the pipeline's board, click **Edit pipeline** at the bottom of the menu. The editor opens as a full page.
  
- Or click **Settings** at the bottom of the same menu, then open **Pipeline stages** in the left menu of the settings window.
  

![Pipeline board menu with Edit pipeline and Settings](https://storage.googleapis.com/reworkv3-public/success/260923/9XYVS7ZQp9cP8d3vQDeJ6RMBBoZhQxQoUrdpru8JAH8WGxUOKBG9VADU3Bxbjno4/img.d3kTzpDoHAa4c2sDfYum2t3TBbst1Rp2rdoKzKYN7OqFPq9GVJwLrIN3wUiGn09v.png)

## Step 2: Check the two switches at the top

![Pipeline stages section with the two switches and Save](https://storage.googleapis.com/reworkv3-public/success/260923/RV48p4g8f65Z6eaYXaqSrqC3XBhZt6aY1hc1Cae6BVrAGjyNFhRXfrXLxuWKCyMd/img.SOlHSHRhoZM6JhNOxGh9pBaibSHSRQHwroyHJ7Qe6RJZ8lAfzbj5Ck2Db2iWXTgm.png)

- **Pipeline stages**: the section you're in when you edit from Settings.
  
- **Custom deal probability**: lets reps set a probability on an individual deal instead of inheriting the stage's. The **Probability** box of every stage only becomes editable while this switch is on.
  
- **Enable stage colors**: gives each stage its own color on the board. Turn it off and the **Stage color** picker disappears from every column.
  
- **Save**: nothing you change in the editor is stored until you click it. **Cancel** throws every unsaved change away, so you can experiment freely.
  

## Step 3: Edit a stage

Every stage is one column. You can change any of these:

![One stage column with its name, probability, rotting and color](https://storage.googleapis.com/reworkv3-public/success/260923/T6aIWMNyx9SbawdJkuIGZpEyehqTOjf8cXFeOkskHKSMbZhgHmU9cbVHcWpaS2bl/img.uZoUw4eTlhZHDtbqSJhFAXATGyMpJrdUySM2B4MhcgTTlCNUgleLKRjQ0YvU8a09.png)

1. **Name**: rename the stage. Deals already in it move with it, so a rename never strands a deal.
   
2. **Probability**: how likely a deal at this stage is to be won, in percent. It drives the weighted value on the board and in the forecast. See [Understanding probability](https://support.rework.com/article/understanding-probability).
   
3. **Rotting in (days)**: turn it on and enter a number of days. A deal left untouched in this stage for longer is flagged as rotting on the board. Turn it off and the stage never flags a deal.
   
4. **Stage color**: pick a swatch, or the last one for a custom color.
   

The column head sums the stage up as you type, for example _Referral received · 20% · 7 days_.

## Step 4: Reorder or insert stages

![A stage head to drag and the + that inserts a stage](https://storage.googleapis.com/reworkv3-public/success/260923/I6y4aykE2XfS3gc3g4G4AuTr591KW0VnJB3IuH447YxbaNtP9QJPs3UlonvqCPY4/img.YGL4qOJP0cYsBWF20I1UQDn7zsq1x6w4rjAYB9IXwzAYmwRPAYmcsnt2CKY6rXLi.png)

1. **Drag a stage head** left or right to move the stage. Deals keep their stage; only the order on the board changes.
   
2. **+** between two columns inserts an empty stage at exactly that point, for example a _Security review_ between _Joint proposal_ and _Negotiation_.
   

## Step 5: Add a stage at the end, or remove one

![Add stage at the end of the row and Remove this stage under a column](https://storage.googleapis.com/reworkv3-public/success/260923/vk9ivsVzhHf0l9bWa7609B5r9M3NfWoandRTfsSrp1OE4kJmpu9uBsaKJbOiWuCq/img.wIGDaEMcAMAdqQYq2bI4DrTxU0WVQWJszicP9sZGDqRRIrBMScGn7khWFlU1zZwU.png)

1. **Add stage**: scroll to the end of the row and click it to append a stage after the last one.
   
2. **Remove this stage**: sits at the bottom of every column.
   

A stage you just added disappears as soon as you remove it. A stage that's already saved isn't deleted straight away. Instead, the column is covered with a notice:

![A saved stage marked for removal, with Save](https://storage.googleapis.com/reworkv3-public/success/260923/DunRkUt7xMpmoFkmKCn0QB1gGpiSHUNyG57PXmpLQBbf45YwgQXAgSYDTNncIGVh/img.G3lbrTLaFguLNAX49hD9WjETxndrfi8FAdesxHeXJVCOU4qxs7DjpZT0RB0RDrdD.png)

1. **This stage is set to be removed**: the stage is archived when you save. Changed your mind? Click **Cancel** on the notice to keep it.
   
2. **Save**: applies every change at once: renames, new stages, the new order and the removals.
   

> **Warning:** Archiving a stage takes it off the board, but it doesn't move the deals that were sitting in it. Those deals keep their history, including the stage they were in. Before you remove a stage that still holds open deals, move them to the stage that replaces it. See [Move a deal through stages](https://support.rework.com/article/move-a-deal-through-stages).

A pipeline always keeps at least one stage, so **Remove this stage** is greyed out on the last one left.

## What each change does to existing deals

| Change | Deals already in the pipeline |
| --- | --- |
| Rename a stage | Stay in the stage, now shown under the new name |
| Change probability | Stay in the stage; the stage's weighted value uses the new number |
| Change rotting days | Are judged against the new limit from now on |
| Reorder stages | Stay in their stage; the board shows the new order |
| Insert or add a stage | Are not moved; the new stage starts empty |
| Remove a stage | The stage is archived on save; deals keep their history |

> **Note:** There's no "Won" or "Lost" stage to edit. Winning and losing are deal statuses, set with the **Won** and **Lost** buttons on a deal. To stop reps from skipping or going back through stages, see [Pipeline rules and additional settings](https://support.rework.com/article/pipeline-rules-and-additional-settings).
