# How to design a process before you build it

Work out the six things every process needs, then turn them into a service, a flow and its steps.

Source: https://support.rework.com/article/how-to-design-a-process

Most companies already run dozens of processes: buying something, hiring someone, refunding a customer. They usually live in a chat thread, a spreadsheet and somebody's memory, which is why nobody can answer "where is it now?". Before you build anything in the app, it really pays to write the process down. A process that's clear on paper takes an afternoon to build; one that's vague takes weeks of rework.

## The six questions

Answer these six questions about your process, in this order.

| Question | What you're deciding |
| --- | --- |
| **Objective** | What does this process exist to produce? One sentence. |
| **Start and finish** | What starts a run, and what counts as finished? |
| **Steps** | The stages the work passes through, in order. |
| **People** | Who does each step, and who decides. |
| **Information** | What has to be captured, and at which step. |
| **Time** | How long each step should take. |

Worked through a purchase request, the answers look like this:

| Question | Answer |
| --- | --- |
| Objective | Get approved spending turned into a placed order, with a record of who approved it. |
| Start and finish | Starts when somebody asks to buy something; finishes when the order is placed, or when it's rejected. |
| Steps | Request → (over $5,000: Finance sign-off) → Place the order. |
| People | Anyone can request. Jane in Finance approves. Tracy places the order. |
| Information | Item, amount, vendor, why it's needed, and the date it's needed by. |
| Time | Finance decides within a day; ordering happens within two days. |

> **Tip:** Write the steps as things that **finish**: "Place the order", not "Ordering". A step that can't be finished can't be moved on, and a flow made of activities rather than completions tends to stall. 💡

## Translate the answers into the product

Each answer maps to one thing you'll build.

| Your answer | In the product |
| --- | --- |
| The process itself | A **service** ("Purchase Request") |
| The steps and how they connect | The service's **flow**, drawn in the **Builder** |
| One run of the process | A **job** ("Figma team seats (12)") |
| One step | A **block**, usually a **Custom Step** or an **Approval** |
| What gets captured | **Fields**, declared on the step that collects them |
| Who acts | The step's **assignees** |
| A fork in the road | A **Decision** step |
| How the run ends | An **End Flow** step and its **outcome** |
| How long a step may take | The step's **deadline** |

So the purchase request becomes: a service called Purchase Request, whose flow starts with a **New request** step collecting five fields, then a **Decision** that asks whether the amount is over $5,000, then an **Approval** for Finance on the expensive branch, then a **Custom Step** for ordering, and two ends: **Purchased** and **Not approved**.

## Three habits that keep flows healthy

**Model the exception, not just the happy path.** Every process has a path where the answer is no. If you don't draw it, the job has nowhere to go and sits waiting on somebody who has already decided. Give rejection its own End Flow step with its own outcome, so "how many were rejected" is a number you can read later.

**Collect information where it's known.** A field that the requester can't answer doesn't belong on the first step. Ask for the vendor quote at the step where somebody has the quote in hand.

**Keep the first version short.** Five steps that people actually use beat fifteen that they route around. Don't worry about getting it perfect: you can add a step later. The flow keeps running while you edit it, and jobs already in flight finish on the design they started with.

## Then build it

With the six answers written down, building is mechanical: [create the service](https://support.rework.com/article/create-a-service), [design the flow](https://support.rework.com/article/design-your-first-flow), and [decide what each step collects](https://support.rework.com/article/collect-the-right-information). If you're unsure which step type matches an answer, see [Choose the right step type](https://support.rework.com/article/choose-the-right-step-type).
