# How work is organized

How services, projects, boards, tasks and sub-tasks fit together, and what belongs at each level.

Source: https://support.rework.com/article/how-work-is-organized

A workspace stays easy to run when everyone agrees where each piece of work lives. If one team files client deliverables as projects and another files them as tasks, reports stop adding up and people stop trusting the boards. Rework Projects uses one fixed hierarchy, from the kind of work down to the smallest step. This article walks you through each level, what belongs there and why.

## The hierarchy at a glance

**Service** > **Project** > **Board** > **Task** > **Sub-task**

| Level | What it is | Example at Northwind Studios |
| --- | --- | --- |
| Service | A kind of work, with its own stages, task types, modules and fields | Client Design Projects |
| Project | One piece of work with an owner, a team, a deadline and a budget | Atlasworks Website Redesign |
| Board | A list of work items inside a project | Tasks, Issues |
| Task | One deliverable or step someone is responsible for | Homepage wireframes |
| Sub-task | A smaller step that rolls up into its parent task | Hero section |

Alongside the boards, each project also has project-wide pages: **Roadmap**, **Documents**, **Workloads**, **Costs** and **Incomes**.

### Level 1: Service

A service describes a **kind of work**, not a team or a client. Everything that should be the same for every project of that kind is set on the service:

- The [project stages and item stages](https://support.rework.com/article/project-stages-and-item-stages) work moves through.
  
- The [work item types and fields](https://support.rework.com/article/work-item-types-and-fields) people pick when they add tasks.
  
- Which modules are on, such as **Cost**, **Income** or **Issues**.
  
- Who owns the service and who can see it.
  

Services sit under **Project Services** in the sidebar, grouped into service groups such as **Client work** and **Internal**.

1. The service, **Client Design Projects**, in the sidebar.
   
2. Its projects. Every project belongs to exactly one service.
   

![Client Design Projects service with its projects listed](https://storage.googleapis.com/reworkv3-public/success/260923/DEJsvqnH8dZzYVapEVyJgC7Sy6ECP7NYrpbFUiAWKUadt43tXlFJtRFhceZ94SWi/img.ZtoMv7Bi5Oeys09UiySuI2Xq6MIPXNrUk4tqgSGsOZ4cvyLZF7guYgRNmufQxbbJ.png)

**What belongs here:** a new service when the work follows different stages or needs different task types. Northwind runs branding, websites and campaigns through **Client Design Projects** because they share a Discovery, Design, Build and Launch rhythm. The office move runs through **Internal Operations**, because it has no client, no income and different kinds of task.

**What doesn't:** a service per client or per team. Use projects for clients and project roles for teams, or you'll end up maintaining the same stages many times over.

### Level 2: Project

A project is **one piece of work with a clear end**. It has owners, team members, a deadline, a status, a health check-in and its own money figures.

1. The project-wide pages: **Roadmap**, **Documents**, **Workloads**, **Costs** and **Incomes**. These cover the whole project, not one board.
   
2. The project's boards, listed under **Boards**.
   

![Atlasworks Website Redesign project with its pages and boards](https://storage.googleapis.com/reworkv3-public/success/260923/UOI1AJMnb6zjKugAoLBMnKcXCz9qGP36Z9FCeRPu1RlQuKnrnGuvMpOqET3UEK6N/img.oerijrRpEm41iM4AP7UDjuiXgTCJom3uoULJxFVjHcfKfS0hs0jj7obhRS2LHPIA.png)

**What belongs here:** one engagement or initiative, for example _Atlasworks Website Redesign_ for a client, or _Studio Office Move_ internally. If the work has its own deadline, budget or client sign-off, it's a project.

**What doesn't:** recurring routines with no end. Keep those as tasks in a long-running project, such as an _Operations_ project in the internal service.

Each project page answers a different question:

| Page | Answers |
| --- | --- |
| Overview | How is the project doing? Task completion, financials, milestones and the latest check-in |
| Roadmap | When does each phase happen, and which milestones mark the way? |
| Documents | Where are the brief, the contract and the meeting notes? |
| Workloads | How much effort is planned, and for whom? |
| Costs | What has the project cost so far? |
| Incomes | What has been billed or earned? |

Which pages you see depends on the modules turned on for the service.

### Level 3: Board

A board is a **list of work items** inside a project. Every project starts with two:

- **Tasks** for the planned work.
  
- **Issues** for problems and risks that come up along the way. Issues only appear when the **Issues** module is on.
  

You can add more boards with **+** next to **Boards**, for example a separate board for a second workstream. Each board has its own views: **Table**, **List**, **Board**, **Timeline** and **Calendar**.

**What belongs here:** a board per workstream that has a different audience or rhythm. Most projects need only **Tasks** and **Issues**.

### Level 4: Task and groups

A task is **one deliverable or step with one person responsible**. It carries a status, an item stage, a work item type, an assignee, a DRI, dates and priority.

Inside a board, tasks are organized into **groups**. Groups are there to make the board easy to read, so name them after phases or areas of work.

1. A group, **Discovery**, with the number of tasks in it.
   
2. A task, **Homepage wireframes**, with its code, status, stage and type.
   
3. A sub-task, **Hero section**, indented under its parent.
   

![Tasks board with groups, a task and its sub-task](https://storage.googleapis.com/reworkv3-public/success/260923/10yRZ08Wv8LE1urvhkbrppJfJNzpMRAlGO6UuFGz0Xe9jMjvU5B15KWpkYJvRpYX/img.hidzxbcTp0NpqwUrOm8QBSLDFysqK77ef0d3BR9Gi5mHvO21MMguLDoLTjTZyZbL.png)

**What belongs here:** something one person can finish and someone else can check, for example _Homepage wireframes_. If the name needs "and" to describe it, consider splitting it. 💡

### Level 5: Sub-task

A sub-task **breaks one task into smaller steps** without creating a new deliverable. It appears indented under its parent, and the parent shows how many sub-tasks it has.

**What belongs here:** the steps of one deliverable, for example _Hero section_ and _Case study grid_ under _Homepage wireframes_. Keep it to one level. If a sub-task needs its own sub-tasks, it's probably a task in its own right.

## Planning across the project: Roadmap

Tasks describe the work. The **Roadmap** describes time. It shows the project's **phases** as bars and its **milestones** as checkpoints, such as _Design sign-off_ and _Go-live_.

1. **Roadmap** in the project menu.
   
2. The milestones on the timeline.
   

![Roadmap for Atlasworks Website Redesign with two milestones](https://storage.googleapis.com/reworkv3-public/success/260923/SZSBU7Vub4S6SMD36vCftmIszB9sRXtKr2oEYCuiBRfCkBwVgH8aU7xEKHdrDZDb/img.hd9JCQpFW2joVu8tH0pKuuXL9uNxsjbrJo7uu6z7mV49mDrz8w9m4WNxA8GOUjJO.png)

Use milestones for the moments a client or manager signs something off, and phases for the stretches of work in between. Both also appear on the project **Overview**.

## A worked example

Here's how Northwind Studios sets up a website for Atlasworks:

| Level | Northwind's choice | Why |
| --- | --- | --- |
| Service | Client Design Projects | It follows the same stages as every client design job |
| Project | Atlasworks Website Redesign, managed by Quinn | One client engagement with its own deadline and budget |
| Board | Tasks, plus Issues for client blockers | Planned work and problems stay separate |
| Groups | Discovery, Design, Development, Launch | Read the board phase by phase |
| Task | Homepage wireframes, assigned to Jolie | One deliverable, one owner |
| Sub-task | Hero section, Case study grid | Steps within the wireframes |
| Roadmap | Design sign-off, Go-live | The two dates the client cares about |
| Workloads, Costs, Incomes | Design and development effort, client invoice | The project's margin in one place |

Next, learn how a project and a task each move forward in [Project stages and item stages](https://support.rework.com/article/project-stages-and-item-stages).
