# Moving a lead through stages

Move a lead to another stage or status, one at a time or in bulk, and what to do when a stage asks you to fill in required fields first.

Source: https://support.rework.com/article/lead-moving-stages

> **In plain words:** A **stage** is a step in your pipeline, such as New, Attempting or Connected. Moving a lead from stage to stage is how you show real progress, and your reports are built on it. Your admin can decide that a stage needs some details first, for example a budget. This page shows how to move leads and what to do when Lead asks for those details. New to the words? See [Lead basics](https://support.rework.com/article/lead-basics).

**Where to find it:** Lead > open a lead > the **stage bar** under its name. Or the lead list > tick leads > **Qualify**. **Who can use it:** People who can manage the lead, for example its owner or a manager of the service. If you can only view a lead, the stage bar is greyed out.

## Stage and status are two different things

| 
 | 

Stage

 | 

Status

 |
| --- | --- | --- |
| 

What it answers

 | 

How far along the pipeline is this lead?

 | 

What is going on with it right now?

 |
| 

Examples

 | 

New, Attempting, Connected

 | 

Prospect, Open, Nurture, Inactive, Not a target

 |
| 

Who defines it

 | 

Your admin, per service

 | 

Your admin, per service. Five come ready-made.

 |
| 

Does it ask for fields?

 | 

It can

 | 

No

 |

They move independently. A lead can be at the Connected stage with the status Nurture, because the person is interested but not ready. Changing one never changes the other, unless you do both in the **Move stage** dialog. For the setup side, see [Lead services and stages](https://support.rework.com/article/lead-lead-services-and-stages) and [Labels, statuses, segments and views](https://support.rework.com/article/lead-labels-statuses-and-views).

Every stage belongs to one of four **stage groups**: **Not started**, **In progress**, **Qualified** and **Disqualified**. The group matters for the required-field rules below.

## Move one lead

Pick whichever is closest to hand:

- **Stage bar.** On the lead screen, click the stage you want in the bar under the lead's name. The current stage is filled in. Hovering a stage shows "Move to" and its name.
  
- **⋯ menu.** Click **⋯** in the header, then **Change stage**, then pick a stage. For the status, pick **Change status** instead.
  
- **Stage field.** In the **Lead Info** panel, hover over **Stage** or **Status** and click the small pencil.
  
- **List.** In the lead list, edit the **Stage** or **Status** cell with its pencil.
  

![Lead detail header with the stage bar showing the pipeline's stages from New to Disqualified](https://storage.googleapis.com/reworkv3-public/success/261015/5arOJYfvduoyjVzet1YNRXVLAhWsTDL8ILXmCpUPdYB2i33r3neWfxLHOANnDfgI/img.zOad09E8OTsWYGGMrv8BeNzT78OyPMmGlZjf0M2nMSH14Z3VSjR30LzZBP6uLHka.png)

If the stage needs nothing more, the lead moves at once and you see "Stage updated". If it needs details, the **Move stage** dialog opens. The next section explains it.

## When Lead asks you to fill in fields

Your admin can mark a custom field as **required** for a stage. See [Custom fields](https://support.rework.com/article/lead-custom-fields). Then Lead will not move a lead past that stage until the field has a value. This keeps your data honest: you cannot reach "Qualified" without the facts that make a lead qualified.

When this applies, the **Move stage** dialog opens and says **Fill the fields this stage requires**. It shows:

- **Lead** and **Service**, for reference.
  
- **Stage**, with the stage you chose. You can pick another one here, and the fields below update.
  
- **Status**. You can change the status in the same step.
  
- The custom fields for that stage, with the required ones marked. A **Custom fields** section shows how many are missing, for example "1 missing".
  

Fill the required fields and click **Move stage**. The lead moves and the values are saved on it. If you leave one empty, the dialog shows "{field name} is required" under that field, for example "Budget is required", and the lead stays where it was. Click **Cancel** to leave the lead where it is.

![Move stage dialog opened by clicking Connected on a lead in Attempting, showing Lead, Service, Stage](https://storage.googleapis.com/reworkv3-public/success/261015/0reUKhBtZ6Atmymaxwf0LItEcF43uVwDZMOzsf021Qlf9MemAch1p1pnogGIA2dt/img.3tXZFoKYW1IZonIlntxWNFiOAqlDvbiZEm0Nq5c6y2CJ2knLYE6Ev3NQZqXsR0mi.png)

### Which fields are asked for

Lead looks at the stage you are moving **to** and at the stages **before** it in the same group. A field is demanded when:

1. It is set as required for a stage that comes **earlier in the same group** as your target stage, and the field is still empty. In short: you must fill the field before you leave the stage it belongs to.
   
2. It is a plain required field not tied to any stage, and it is empty.
   

Two details that surprise people:

- The rule works **inside one group**. Stages of other groups do not count.
  
- The first stage of a group never asks for its own field on the way in. A field required at a stage is demanded when the lead **moves on** from it.
  

Spot a red **Missing value** pill in **Lead Info**? That is a field the lead's current stage already demands and nobody has filled in.

### A required field cannot be cleared

Once a stage demands a field, you cannot empty it again while the lead sits there. Lead refuses the change and tells you the field is required.

### Leads created automatically are not blocked

The rule applies to moves that people make. Leads that arrive through an import, a webhook, a website form or an automation are never refused because a field is empty. They just arrive, and the missing field shows up the next time someone moves the lead.

## Worked example

Your pipeline has these stages:

| 
Stage

 | 

Group

 |
| --- | --- |
| 

New

 | 

Not started

 |
| 

Attempting

 | 

In progress

 |
| 

Connected

 | 

In progress

 |
| 

Proposal sent

 | 

In progress

 |

Your admin made a custom field **Budget** and marked it **Required in these stages** for **Connected**. See [Custom fields](https://support.rework.com/article/lead-custom-fields).

1. A new lead sits at **New**. You call, reach nobody and click **Attempting** in the stage bar. The lead moves at once. Budget is not asked, because no earlier In progress stage needs it.
   
2. You talk to the person and click **Connected**. The lead moves at once. Budget is not demanded yet, because you have not left **Connected**.
   
3. After the call, you click **Proposal sent**. The **Move stage** dialog opens: "Fill the fields this stage requires". **Budget** is marked required and empty.
   
4. You click **Move stage** without a value. The dialog shows "Budget is required". The lead stays at **Connected**.
   
5. You type 20,000 in **Budget** and click **Move stage**. The lead moves to **Proposal sent**.
   
6. Later you try to clear Budget on the lead. Lead will not let you, because **Proposal sent** demands it.
   

If you had clicked **Proposal sent** straight from **New**, the dialog would also have opened: skipping a stage does not skip its fields.

## Move many leads: bulk Qualify

1. Open a lead service and tick the leads you want to move. The tick-all box ticks only the current page.
   
2. Click **Qualify** in the bar that appears. A dialog called "Qualify N leads" opens.
   
3. Pick a **Status**, a **Stage**, or both. The **Stage** list is there because you are working inside one lead service. Leave a box on "keep" to leave that value alone.
   
4. Click **Apply**.
   

Each lead is checked on its own. Leads that are ready move, and a message tells you how many ("Updated 8 leads"). A lead that still needs a field is skipped, and the message names it and what is missing, for example "Errors: Mia Costa (Needs: Budget)". Open that lead, fill the field and move it by hand.

You can change the status of many leads at once with **Edit field** too. See [Bulk actions and bulk email](https://support.rework.com/article/lead-bulk-actions).

## Troubleshooting

| 
Problem

 | 

Why it happens

 | 

What to do

 |
| --- | --- | --- |
| 

The dialog says "{field} is required"

 | 

The stage you are leaving needs that field

 | 

Fill it in the dialog and click **Move stage**.

 |
| 

The stage bar is greyed out

 | 

You can view the lead but not manage it

 | 

Ask the lead's owner or a service manager.

 |
| 

"Could not move stage"

 | 

Something unexpected stopped the move

 | 

Try again. If it keeps failing, check the lead's fields for errors and see [Common errors and fixes](https://support.rework.com/article/lead-common-errors).

 |
| 

Bulk Qualify skipped some leads with "Needs: ..."

 | 

Those leads lack a field the stage needs

 | 

Open each lead, fill the field, move it.

 |
| 

I cannot clear a field

 | 

The lead's stage demands it

 | 

Type the correct value instead of clearing it, or ask your admin to change the rule.

 |
