# Playbook: round-robin with a 15-minute response target

Share new leads fairly among your reps in turn, and re-assign any lead nobody touched within 15 working minutes, then watch the results by agent.

Source: https://support.rework.com/article/lead-playbook-round-robin-sla

> **In plain words:** This playbook shares every new lead among your reps in turn (**round-robin**) and sets a promise: the rep who gets a lead must act on it within 15 minutes of working time. If they do not, Lead tells them and gives the lead to someone else. You will build the team, the clock and the router, then test and monitor them. New to the words? See [Lead basics: words to know](https://support.rework.com/article/lead-basics).

**Who this is for:** a sales manager or admin who wants fast, fair first contact. **What you'll have at the end:** a distribution team with fair limits, an Active "First response" clock with a 15-minute working-hours target, a published router that assigns and re-assigns on breach, and a view of how each rep is doing. **Time:** 30 to 45 minutes, plus 20 minutes to watch a test.

## Why this matters

A lead is warmest in the first minutes. Most are answered late, or never, because nothing makes it happen. A router assigns the owner and starts the clock whether or not anybody is watching. Taking turns also stops one eager rep from taking every lead.

The scenario is Bright Dental, which sells dental software. Hoa, Nam and Tuan answer demo requests. Linh, the manager, wants a first call or note within 15 minutes of working time, and a safety net when a rep is busy.

## Words used in this playbook

- **Round-robin:** leads are handed out in turn, so each person gets a fair share.
  
- **Assignment limit:** the most leads a person may be given in a day, a week, a month, or hold at once.
  
- **SLA metric:** a clock with a start, a stop and a target.
  
- **Breach:** the clock ran out before the stop event.
  
- **Working hours:** the clock counts only the hours the owner is at work, taken from the owner's Timesheet (the work schedule your admin assigns).
  
- **Re-assign:** hand the lead to someone else. A team never picks the person who currently owns the lead.
  

## Before you start

- A lead service with a source that creates leads. See [Playbook: set up Lead from scratch](https://support.rework.com/article/lead-playbook-first-setup).
  
- The reps are active users, and each has a **Timesheet** assigned. If an owner has no Timesheet, a **Working hours** target silently runs 24/7. Ask your administrator to check.
  
- You can manage the lead service, so you see **SLA & Routing** in the sidebar.
  
- Reps know what counts as contact. The clock stops when a rep logs a note, email, call or meeting on the lead in Lead. A call made elsewhere and never logged will not stop it.
  

## Steps

### Step 1: Create the team and choose round-robin

1. In Lead, open your service in the left sidebar, then click **SLA & Routing**, then **Distribution teams**.
   
2. Click **New team**. Type the **Team name** "Demo desk".
   
3. Under **Members**, add Hoa, Nam and Tuan.
   
4. Choose the **Distribution method** **Equal round-robin**.
   
5. Click **Create team**. The team opens.
   

Choose **Weighted round-robin** instead if a senior rep should take more leads. See [Distribution teams](https://support.rework.com/article/lead-distribution-teams).

### Step 2: Set limits so nobody drowns

1. On the team's **Settings** tab, open **Assignment limits**.
   
2. Switch on **Daily limit** and **Concurrent limit**. Set **Reset at** and **Timezone** for the daily one.
   
3. Click **Save changes**.
   
4. Open the **Members** tab. In the new **Daily** and **Concurrent** columns, type a number for each rep, for example 10 and 15.
   
5. Click **Save changes**.
   

A limit with no number for a person does not apply to that person. The concurrent limit counts leads a person owns whose status is Prospect, Open or Nurture. A rep who is full is skipped for the next lead.

### Step 3: Create the "First response" clock

1. In **SLA & Routing**, click **SLA metrics**, then **New metric**.
   
2. Choose the **Metric type** **Time**.
   
3. Type the **Metric name** "First response".
   
4. Choose the **Measurement scope** **Per object + owner**. Each owner gets their own clock, and a new owner starts fresh. Keep **Occurrence** on **Single**.
   
5. Under **Start on events**, pick **Lead assigned (includes reassignment)**.
   
6. Under **Stop on events**, pick **First activity logged after assignment (note, email, call, meeting, quick log)**.
   
7. Tick **Notify the owner when this metric is breached**. Click **Create**.
   

Use the "after assignment" event. The plain **First activity logged** event fires only once in a lead's life, so a re-assigned lead would never stop.

### Step 4: Add the 15-minute target and switch it on

1. On the metric's card, click **Add target**.
   
2. Type the **Label** "15 minutes". Set the target to 15 and the **Unit** to minutes under **Working hours**.
   
3. Click **Add target**.
   
4. Click the **⋯** menu on the card, then **Activate**. The badge changes to **Active**.
   

A metric starts as **Inactive** and measures nothing until you activate it. Lead adds a grace of 2 minutes when it checks a deadline.

> **Tip:** If you have no real data yet, run with a generous target for two weeks. Then set 15 minutes from what you see. A target missed nine times in ten gets ignored.

### Step 5: Build the router

1. In **SLA & Routing**, open **Routers** and click **New flow**.
   
2. Type the **Flow name** "New lead to Demo desk". Under **Flow type**, click **Lead Owner Router**, then **Create**.
   
3. In the gallery, click **Round Robin Assignment**.
   
4. Click the **Trigger** block. Under **Event**, choose **Record is created**.
   
5. Click the **Assign & Update Ownership** block. Leave **Assign to** on **Team**. Under **Distribution team**, pick "Demo desk".
   
6. Under that block, click **+** and choose **Service Level Agreement**.
   
7. For **Evaluate by**, choose **Metric**. For **When to evaluate**, choose **On metric evaluation**. Under **Metric**, pick "First response".
   
8. Under **On metric breach, do**, tick **Send message** and **Re-assign**.
   
9. Under **Re-assign**, set **Assign to** to **Team** and pick "Demo desk" again. The team skips the rep who currently owns the lead.
   
10. If an **N issues** badge shows, click it and fix each line.
    

![A router with its Trigger block](https://storage.googleapis.com/reworkv3-public/success/261015/qWHrzIINI39PX6M36VgV5LTbh4Z8Js6H11JwoirPEBmFrUcUVKs090NTEnwACNAF/img.Z7fjMk0WUhxyQqCKUTDVtiYhUjXq5WZ3NbVlFnfLe345NbLyA226T2QakkUB9hvo.png)

### Step 6: Publish

1. Click **Publish**. You see **Flow published**, and the badge changes from **Draft** to **Running**.
   

The team and the metric were frozen into the version when you published. If you change the team's members, order or method later, publish the router again. Pausing a person and changing limits apply at once. See [Publishing, versions and republishing](https://support.rework.com/article/lead-publishing-and-versions).

### Step 7: Test it

1. Create three test leads on the lead list, with **New lead**, then **Create manually**, and **Create lead**. Use made-up names.
   
2. Open each lead. They go to three different reps in turn.
   
3. As the owner of the first lead, log a **Note**. The clock stops.
   
4. Leave the second lead alone for 17 working minutes. Lead re-assigns it to another rep and tells the first owner.
   
5. In **SLA & Routing**, open **Metric evaluations**. The first lead is **Met**. The second shows **Breached**. The new owner has a fresh clock **In progress**.
   
6. Open the second lead's **Automation** tab and click the router run. The timeline shows who was assigned at each step, including the re-assign step.
   

Afterwards, set the test leads to the status **Not a target**.

### Step 8: Monitor in SLA reports

1. In **SLA & Routing**, click **SLA reports** under **Monitoring**.
   
2. Switch between **Daily** and **Weekly**. Read **Compliance**, the share of finished clocks that met their target.
   
3. Scroll to **By agent**. It shows one row per rep and one column per metric: the average time and the share that met target.
   
4. Check **Recent breaches** and click one to see the lead.
   
5. Use the download icon (**Download CSV**) on a table to share it.
   

_Example:_ in week one, 300 clocks finished. 246 were met and 54 breached, so compliance is 246 / 300 = 82%. Hoa's row says 95% met, and Tuan's says 55%. Check Tuan's limits and open leads before blaming him.

## Check it worked

- Three new leads go to three different reps in turn.
  
- Each lead's owner got a bell message, **Lead assigned to me**.
  
- **Metric evaluations** shows **Met** for a lead that got a note, and **Breached** for one that did not.
  
- A breached lead moved to a different rep, never back to the same one.
  
- **SLA reports** lists every rep under **By agent**.
  

## Troubleshooting

| 
Problem

 | 

Why it happens

 | 

What to do

 |
| --- | --- | --- |
| 

Every lead goes to one rep.

 | 

The others are paused, inactive or at a limit.

 | 

Open the team's **Members** and **Monitoring** tabs.

 |
| 

"No eligible assignee" appears in the run.

 | 

Every member is skipped, or the re-assign finds only the current owner.

 | 

Read the reasons in the line. Unpause, raise a limit or add a member.

 |
| 

**Metric evaluations** is empty.

 | 

The metric is **Inactive**, has no target, or the router is not published.

 | 

Activate it, add a target, publish.

 |
| 

Clocks keep running at night.

 | 

The owner has no Timesheet, or the unit is **Calendar (24/7)**.

 | 

Use the **Working hours** unit and ask your administrator to assign Timesheets.

 |
| 

The clock never stops.

 | 

The rep did not log activity on the lead in Lead.

 | 

Agree what counts as contact. Log a note, call, email or meeting on the lead.

 |
| 

A new team member gets no leads.

 | 

The roster is frozen in the published router.

 | 

On the team's **Routers** tab, click **Republish selected**.

 |
| 

Everyone breaches in week one.

 | 

The target is unrealistic.

 | 

Re-set it from two weeks of data.

 |

More fixes: [Fix it by symptom](https://support.rework.com/article/lead-fix-by-symptom) and [Common errors and fixes](https://support.rework.com/article/lead-common-errors).
