# Project health and check-ins

Share how a project is really doing with a quick check-in, and read its health on the Overview, the check-in trail and your project lists.

Source: https://support.rework.com/article/project-health-and-check-ins

A project's numbers can look fine while the people running it know it's slipping. A client has gone quiet, a key file is late, a launch date is at risk. **Check-ins** let the project manager say so in one click: a status, a progress figure and a short summary. Every check-in also freezes a snapshot of the project's numbers at that moment, so anyone can see later what was known and when. Here's how to file one and where project health shows up.

## Health at a glance

A project's health is one of three labels:

| Status | Use it when |
| --- | --- |
| **On track** | The project will meet its dates and budget as planned |
| **At risk** | Something could make it miss a date or go over budget, but it can still be recovered |
| **Off track** | It will miss a date or its budget unless the plan changes |

Health comes from the **latest check-in**. A project with no check-in yet shows a health worked out from its score instead, so every project has a label from day one.

### Step 1: Find the project's status

Open the project. The right side of the **Overview** shows its health:

1. The health label of the latest check-in, for example **At risk**.
   
2. **Update status** opens a new check-in.
   
3. The status card: health, percent complete, the **Summary**, and who reported it and when.
   

![Q4 Campaign Launch Overview with the At risk label, Update status and the status card](https://storage.googleapis.com/reworkv3-public/success/260923/veAut2ZmHeL4cNSGBj5uM0xByBHjLl8X1AGx9XgE4EHPrLnWq74t0mJKjENWP6NQ/img.DauVDSxhcTNb0WFmcK4ROUOTcrWw6TFnFZuGJqp6ROpPxALaZ3M1MaGJFaZ6yFC1.png)

### Step 2: File a check-in

Click **Update status**. The **New check-in** form opens for the current project.

1. **Status**: Choose **On track**, **At risk** or **Off track**.
   
2. **Progress**: Drag the slider to how complete the project is right now.
   
3. **Summary**: Write what changed, what's blocking the project and what happens next.
   
4. Click **Update status**.
   

![New check-in form with At risk, 60% progress and a summary](https://storage.googleapis.com/reworkv3-public/success/260923/idd9W3K1QzWdC9sdKwtJXBLkfElrTlpJjsAmngkaYSxR1qZvbbWqZ80F53u4j5Np/img.emVeDPsWp7oi1MApAT2ReATL8U3WWzyO89XNMlkXL6J5J8mWEcXzpmZ8OUSNSU2Z.png)

For example, Harry runs the Q4 Campaign Launch. The social ad set is now approved, but the landing page copy is still with the client. He files **At risk** at 60%, and says the launch may slip by a week.

> **Note:** In most teams the project owner files a check-in each week, or whenever the picture changes.

A good summary answers three questions in two or three sentences:

| Question | Example |
| --- | --- |
| What changed? | Social ad set is approved. |
| What is blocking us? | Landing page copy is still with the client. |
| What happens next? | Launch may slip by a week unless copy arrives by Friday. |

### Step 3: Read the updated status

After you file, the Overview updates right away:

1. The status card shows the new check-in: **At risk · 60% complete**, the summary, and your name.
   
2. **Earlier check-ins** lists the previous reports with their status and progress. Click **View all** to open the full trail.
   

![Overview after filing, with the new status card and Earlier check-ins](https://storage.googleapis.com/reworkv3-public/success/260923/aqu1EYVp7QtmGJJw1sX5UF3MkDXn0GYKqv7w76A89OyeENMUfJUSXVRLbxMvCp90/img.nDzToW4HBkt5IT8P9oitbUdh7srmix5yl7A1KKJaIV1Rh8xzLPWyybhWG3tYuS0w.png)

### Step 4: Review the check-in trail

Click **Update status** in the project menu to open the **Check-ins** panel. It lists every report on the project, newest first.

1. Each check-in shows its status, date, **Progress**, summary, and who filed it.
   
2. **At the time of this report** is a snapshot frozen when the check-in was filed: **Completion**, **Overdue** tasks, **Recorded cost**, and milestones when the project has them.
   

![Check-ins panel with two reports and their snapshots](https://storage.googleapis.com/reworkv3-public/success/260923/NsswfAPzdUf9uGeJfpWDoqRjbQdKhUIo4AkxGO11Al6w3LOwxdfOq80ZqfDkxbgR/img.9b8cUjFYipEV85GyECSZ99yTPZyvDJANYPoskIsVWFqYb2M1CFcQMkNNM05dvr2F.png)

The snapshot never changes afterwards. In this example, the earlier report recorded **$0** cost, while the new one recorded **$2.9K**. Comparing snapshots shows how the project moved between two reports, even if tasks were edited later.

> **Note:** The progress you enter is your own judgement. The snapshot's **Completion** is calculated from tasks. When the two differ a lot, it's worth asking why.

### Step 5: Compare health across projects

Health appears wherever projects are listed, so you can spot trouble without opening each one.

- On **Projects**, switch to **Board**. Each card shows its health label and progress bar.
  
- In **List** and **Table**, the progress ring next to each project takes the color of its health.
  

1. **At risk** on Q4 Campaign Launch, from Harry's check-in.
   
2. **On track** on Atlasworks Website Redesign.
   

![Projects board with health labels on each project card](https://storage.googleapis.com/reworkv3-public/success/260923/DkDXNeUAp7XnMB7aIaSxq9Iz6aGwcEIA87Y4uPAsGv6pvF5esp43RDmR7KJR2l1T/img.xE1m3Jlpq1OWagQkvbi3CkaxJdrRHFapIrxlxFYJc5FNfyfV7ivgax9MVQqb3M2Z.png)

To see every check-in across a service, open the service and click **Update status** under **Cost & Control**. Reports from all its projects are grouped by project, and you can file a **New checkin** for any of them from there.

## Tips for useful check-ins

- **Keep a rhythm.** A check-in every week, on the same day, makes the trail easy to read.
  
- **Change the status early.** **At risk** is a request for attention, not an admission of failure. It gives Eric or Brian time to help.
  
- **Write for someone who wasn't in the meeting.** Name the blocker and the next step, not just "in progress".
  
- **Don't wait for a perfect number.** A rough progress figure with an honest summary is more useful than no report at all.
  

Health tells you how a project is doing. Its stage tells you where it is. See [Project stages and item stages](https://support.rework.com/article/project-stages-and-item-stages).