# Project stages and item stages

Learn the difference between the stages a whole project moves through and the stages a single task moves through, and how to design both.

Source: https://support.rework.com/article/project-stages-and-item-stages

"Where are we?" means two different things. A manager asks it about a whole project: is the Atlasworks website still in design, or already in build? A designer asks it about one task: is the hero section still a brief, or waiting on the client? Rework Projects answers both with two separate sets of stages, so a project's progress and a task's progress never get mixed up. This article explains each set, how they relate to status, and how to design them for a service.

## Two stage sets at a glance

|  | Project stages | Item stages |
| --- | --- | --- |
| Describe | Where a whole project is in its plan | Where one task is in its workflow |
| Apply to | Projects in the service | Tasks and other items on a project's boards |
| Sit inside | The project's **Active** status only | One of five lifecycle statuses: **Draft**, **Active**, **Done**, **Failed**, **Discarded** |
| Example | Discovery, Design, Build, Launch | Backlog, Brief, In design, Client review, Approved |
| Where you see them | The service's projects on a **Board** grouped by **Stage** | The **Stage** column and grouping on a task board |
| Where you edit them | Service **Settings** > **Project stages** | Service **Settings** > **Project items** > **Item stages** |

Both sets belong to the **service**, so every project in the service shares them. Only a service owner or an app admin can change them.

## Project stages

Project stages break a project's active life into the big phases a manager tracks. They only apply while a project is **Active**: a project that's still open, finished or archived has no stage.

To see them, go to **Settings** > **Services**, click the service and open **Project stages**.

1. **Project stages** in the service settings menu.
   
2. The **Active** band. Every project stage lives inside it. Click **Add** to create one.
   
3. The stages in order. Use the arrows to reorder, click a row to rename or recolor it, or click the bin to remove it.
   

![Project stages for Client Design Projects: Discovery, Design, Build and Launch](https://storage.googleapis.com/reworkv3-public/success/260923/VizpRwaHBdtrge1raO1u04C6GimJWm1J7OK5TCECnKlEYveX3lS8xHXY36QqjcDa/img.X4bZssALy6f7E2kSEhytQbJecIae71RWVkHMh6Ni1htkZRusNCrC2vbEECr6cmBM.png)

> **Note:** The description on this page calls them "plan stages". Don't let that confuse you: plan stages and project stages are the same thing.

### See projects by stage

Open the service from the sidebar and switch its projects to **Board**. The board groups projects by **Stage**, one column per project stage.

1. The grouping menu, set to **Stage**. You can also group by **Status** or **Priority**.
   
2. One column per stage, with the projects currently in it.
   

![Client Design Projects board grouped by Stage](https://storage.googleapis.com/reworkv3-public/success/260923/LHDt4nh6DuF3ZTEnfols8Z24NY7xNAz2DAlShdC93QVqqubmhSrJBGk8bJSWu8Dm/img.4PtgsuTHlPl0cNsuMAekoSeru9yjSRnVcB43FT0Q63mVi3ie6sHllrhadKaQ7c37.png)

At Northwind Studios, Eric can see at a glance that one project is in **Discovery**, one in **Design** and one in **Build**, without opening any of them.

## Item stages

Every task has a **lifecycle status**, and that status is what reports and filters count:

| Status | Means |
| --- | --- |
| Draft | Not yet started |
| Active | Work in progress |
| Done | Completed successfully |
| Failed | Did not complete |
| Discarded | Dropped or no longer relevant |

Item stages add finer steps **inside** a status. A task in **Active** can be at **Brief**, **In design** or **Client review**. All three still count as **Active**. When a status has no stages, tasks use the status directly.

To see them, open the service settings and click **Project items**. **Item stages** is the top half.

1. Each lifecycle status is a band, for example **Draft**, with its description.
   
2. The stages inside **Active** for Client Design Projects: **Brief**, **In design** and **Client review**.
   
3. **Done** holds **Approved**. **Failed** and **Discarded** have no stages, so tasks use those statuses directly.
   

![Item stages grouped under Draft, Active and Done](https://storage.googleapis.com/reworkv3-public/success/260923/z740Q0s13dF4UiyAE9bUqet2LsOFZISho9UFE6YulXoVVUg92ARXWhVF9NClRBeA/img.Mlc0VgnW5ouMykRZefhsKCxUlKK3jGjcGw23AOa8cRuFEARP1iGKfDWjO3xuKH2v.png)

Click **Add** next to a status to create a stage in it. Drag a stage to reorder it within its status, then click **Save changes**. A stage can't move to another status, because that would change what it means.

### See tasks by stage

On a project's **Tasks** board, the **Table** view shows both values side by side:

1. **Status**: the lifecycle status, such as **Active** or **Done**.
   
2. **Stage**: the item stage inside that status, such as **Brief** or **Approved**.
   

![Tasks table with the Status and Stage columns](https://storage.googleapis.com/reworkv3-public/success/260923/3O8RRaGd5C6QP3R8FGl55bcn8zRHOo2mxngkHwcu6vbkdSBA4afC3E6o8x5T8Csc/img.l3uWyYs5RrVdAxwUdEwTuOuL7ewiTvDNGFFjBqwCfIPDtPzlJkGuXr3tnU0nSGgB.png)

For example, _Visual design system_ is **Active** at the **Client review** stage, while _Stakeholder interviews_ is **Done** at **Approved**.

To lay out a board by stage, click **Group** and choose **Stage**.

## How the two sets work together

The two sets are independent. A project's stage doesn't move its tasks, and a task's stage doesn't move its project. Here's the Atlasworks Website Redesign on one day:

| Level | Status | Stage |
| --- | --- | --- |
| Project: Atlasworks Website Redesign | Active | Design |
| Task: Stakeholder interviews | Done | Approved |
| Task: Homepage wireframes | Active | In design |
| Task: Visual design system | Active | Client review |
| Task: Build homepage templates | Draft | none |

Quinn moves the project to **Build** when design is signed off. Jolie moves her own tasks through **Brief**, **In design** and **Client review** as she works.

## Design tips

- **Keep project stages few and coarse.** Three to six stages that match how you talk to clients, such as _Discovery_, _Design_, _Build_ and _Launch_. If a stage lasts a day, it belongs on the tasks instead.
  
- **Name item stages after who has the ball.** _Client review_ tells everyone the task is waiting on the client, which a plain **Active** doesn't.
  
- **Put stages only where people need the extra detail.** Most teams need stages in **Active** and perhaps one in **Draft**, such as _Backlog_. Leave **Failed** and **Discarded** without stages.
  
- **Don't repeat the status.** A stage called _Done_ inside **Done** adds nothing.
  
- **Agree on the stages before projects start.** Renaming is safe, but removing a stage that tasks are sitting on leaves them to be moved by hand.
  

To set stages up for a new service, see [Create a project service](https://support.rework.com/article/create-a-project-service). To report how a project is doing beyond its stage, see [Project health and check-ins](https://support.rework.com/article/project-health-and-check-ins).