# Set up your project

Choose the unit and currency your project measures effort in, how it's billed, whether it has a roadmap, and how tasks get reviewed.

Source: https://support.rework.com/article/set-up-your-project

A new project already works, but a few decisions make its numbers and its screens match how your studio runs: hours or days, which currency, how the client is billed, and whether a task needs a reviewer before it can be **Done**. They all live on one page, and each section saves on its own, so you can change one thing without touching the rest.

> **Note:** Only a project owner or an app admin sees **Settings** in the project rail.

## Step 1: Open the project settings

- Open the project.
  
- Click **Settings** at the bottom of the project rail.
  

![The project rail with Settings at the bottom](https://storage.googleapis.com/reworkv3-public/success/260923/vNCFUODf3RfYn5WmMmtb7KKUInWW1BImLDrwaNzo1A4bEBP7oEsRA7lmeyRUIQpI/img.t0MK7FgOyP5g2ZNyiY3zYvWt2a1DD3dqRNKSS7WwnyM3wrYZjNZvhvW8hWcEOdSt.png)

## Step 2: Set the measure and the currency

**Measure & currency** decides the units every rollup is reported in.

- **Workload unit**: **Hours** or **Days**. Effort is summed in this unit on every board and on the project total.
  
- **Currency**: the currency every cost and income rollup is labelled with.
  
- **Hours per day**: how a day converts to hours, and back. Use your studio's working day, for example 8.
  
- The toggle underneath decides whether bookings may carry their own unit and currency. Locked, the booking dialogs force the project's unit and currency. Unlocked, entries are converted to the project's for every rollup.
  
- Click **Save** in this section.
  

![Measure and currency with the unit, currency, hours per day, the booking lock and Save](https://storage.googleapis.com/reworkv3-public/success/260923/IIzTCc1JbqXDwnPlw4ykK6P6F9jUtFgbyZCneCeNLkRdcCLECGb8b7CRqqspocq1/img.VRAOS4enKRdo4VTdMQBvPTmlykhtmibgpq1o7XaOM4eXhayObyEIAb0JUYSiCoEO.png)

## Step 3: Choose the billing type

**Billing type** labels the project in the P&L report and in exports. It doesn't change any calculation. It simply says what kind of engagement this is:

| Billing type | Use it when |
| --- | --- |
| **Retainer** | The client pays a recurring fee for ongoing work |
| **Fixed fee** | The scope and the price were agreed up front |
| **Time & Materials** | The client is billed for the effort actually spent |
| **Milestone** | Invoices are raised as milestones are accepted |
| **Internal / Non-billable** | Studio work with no client invoice |

Pick one and click **Save**.

![The Billing section with the Billing type dropdown and Save](https://storage.googleapis.com/reworkv3-public/success/260923/uiElWp7f9xv4wTL7bHoLspvztVxicWwdu8yoOc2zRfitOMzxZCaFIgCNnZsAUmFH/img.H8Vvokma6dULt21wHtVQ88qwch0zgYFbq67CmAttA9TtQgICY4GpoyPexgEoCuX7.png)

## Step 4: Turn the roadmap on or off

**Roadmap enabled** controls the whole roadmap for this project: the **Roadmap** section in the rail, and the milestone and phase fields on every task.

Turning it off hides all of that. Don't worry, nothing is deleted, and every assignment comes back when you turn it on again. See [Roadmap and milestones](https://support.rework.com/article/roadmap-and-milestones).

![The Roadmap section with the Roadmap enabled toggle](https://storage.googleapis.com/reworkv3-public/success/260923/XiZ0YVixlrg9dAFE2yg6JcvCymBanpFWxDKTUmCkMHcP6yPnFBBBrvqQVM4lSR6P/img.mQ7tdj62uGohvFe0gramwzYZHyv7Kse6NLRn0EbqmFZESHwR1wclyv06vzkoMODt.png)

## Step 5: Decide whether tasks are reviewed

**Enabling task review feature** puts a review step in front of **Done**. When it's on, finishing a task submits it as **Pending Review**, and only a reviewer or a project manager can approve it. Turning it off keeps the settings, so switching review back on restores them.

With review on, the section also offers:

- **Assigned reviewers**: the people who can approve. Project managers can review by default.
  
- **Enable review SLAs**: how long a reviewer has once a task is submitted. Each reviewer gets a reminder due at that point.
  
- **Also enable reviewing subtasks**, with its own SLA and the option to let the person who created a sub-task approve it.
  

The full walkthrough is in [Complete a task and task review](https://support.rework.com/article/complete-a-task-and-task-review).

![The Task review section with the review toggle](https://storage.googleapis.com/reworkv3-public/success/260923/s51ayYW82MQpBcaSwmTPMOYK1acj1mo4ebri2N13XPuGKoS9K5pQtQCjm61u5BFs/img.W8mKDZQWNLAvoKisZMsfJ4NiCnkQ9ftTguPJMD8aaU3oigj0LCY72qPOGgfsWlzR.png)

## Step 6: Check the item fields

**Item Fields** shows the custom fields tasks in this project carry:

- **INHERITED FROM <service>**: the fields the service template defines. The project can't remove them, but it can **Override** whether one is required, important or visible, and **Reset to service default** afterwards.
  
- **ADDED BY THIS PROJECT**: fields that exist only here. Click **New Field** to add one.
  

![Item Fields with the inherited list, the project list and the New Field button](https://storage.googleapis.com/reworkv3-public/success/260923/pAVAsvX5YwzgMAkyW7tbpWmvm0Jctwry3PKX0ib67c4CKmUH3IokgiBMZTXKAcSN/img.94LLf7dFLsB5hkshUwET84CPI83ZthKMDnCbThqZcbGprncIhARXgJOD9j5nJSZy.png)

All set! ✅ Next, check who can do what in the project: [Project team and roles](https://support.rework.com/article/project-team-and-roles).