# Plan schedules and shifts

Pick a schedule type, draw its pattern, build and check shifts for conflicts, then publish them and handle shift requests.

Source: https://support.rework.com/article/timesheet-schedules

Schedules decide who is expected to work, when and where. This article shows you how to set up a schedule, build its shifts, spot problems and publish the result so your team can see it.

## Before you start

- You need to be an **owner** of the schedule (or an admin) to generate, edit and publish shifts. Followers can only view.
- A schedule only **creates shifts**. Points, pay rules and check-in matching live on the timesheet, so set that up separately.
- Add your public holidays in **Settings** → **Holidays** first. They show on the calendar and are skipped when shifts are generated.

## See every schedule at once

Go to **Schedule** → **Scheduling**. The **All Schedules** page puts every schedule on one grid.

![The All Schedules page with the Schedule menu, the Schedules filter, the New shift button, the health strip and the Open shifts row marked](https://storage.googleapis.com/reworkv3-public/success/260930/d8AYkxX1EFeDZFOqmvmqB1S1v66auL4Ytgm0zFcy4lg4aMC5Y7040RCt6SWTj9JV/img.W1HEYnfLdyBwLZbSwiq0mJbKXwEwpZjUh7alhY5WZ6Q0UiK0WbosIbV2dISAahvG.png)

- Pick **Scheduling**, **Shift Requests** or one schedule from the menu **(1)**.
- Use **Schedules** **(2)** to choose which schedules appear, and **New shift** **(3)** to add a one-off shift.
- The health strip **(4)** counts schedules, **gaps**, **open** shifts, **critical** problems, **warnings** and **unpublished** shifts. Click a count to filter the grid.
- The **Open shifts** row **(5)** holds shifts nobody has taken yet.

## Choose the right type of schedule

Go to **Settings** → **Schedules** and click **New Schedule**. The first step asks for the service model:

![The New service wizard on the Type step, showing Fixed Schedule, Contract Schedule and Coverage Schedule and the Continue button](https://storage.googleapis.com/reworkv3-public/success/260930/Cto2x9pb2EA86gur5KaDXuOcCNZoqq3v7ws5K1gzt3c9pukV3keRPLoqtCjYwswx/img.jQyYiRzOpQGDWoNmsSnxAEuqpJRAC6thpZHiUhLb9lGRiUcrLnQ6IH7CfNsrp4yu.png)

| Type | Best for | How shifts are made |
| --- | --- | --- |
| **(1) Fixed Schedule** | Office or fixed-hour staff | Created automatically from the weekly pattern when a timesheet cycle is opened. You only edit the exceptions. |
| **(2) Contract Schedule** | Shift workers on contracts | You click **Generate** for each period, then edit freely. Staff can swap, claim or propose shifts. |
| **(3) Coverage Schedule** | Retail, restaurants, hourly teams | You define how many people each slot needs; **Fill coverage** assigns people and posts open shifts for any gaps. |

Click **Continue** **(4)** and work through **Details** (name and description), **Pattern basics** (working days), **Approvals** (whether shift changes need a manager or HR, and whether staff must confirm their shifts) and **Review**.

## Draw the pattern

A pattern is the blueprint the schedule repeats. Open the schedule from **Settings** → **Schedules** and choose **Schedule** under **Pattern**.

![A schedule's settings on the Pattern Schedule tab, with the settings menu, Apply Template, schedule range, workdays and lock window, groups and the weekly pattern grid marked](https://storage.googleapis.com/reworkv3-public/success/260930/zzXEFGF5LNqaAACHNgBrwAQFgOMWsrCw7y8eRNtBiLLDblfLy3LyqeDW09oGTItX/img.2oCIUBymbR3yrvJwuLm8vBDlkSDr6IdvOfJRFeiaW528EkI3ft52pUrOlg7DGkkF.png)

1. The left menu **(1)** groups every setting: **Overview** (color, owners, followers, auto-publish), **Enrollment**, **Pattern**, **Shift operation**, **Templates**, **Controls** and **Other**.
   
2. Short on time? **Apply Template** **(2)** fills the pattern from a ready-made template. You'll find more under **Settings** → **Patterns**.
   
3. Set the **Schedule range** (**Weekly**, **Biweekly** or **Monthly** rotation), the **Workdays** and the **Lock window** **(3)**. Biweekly asks you when week 1 starts.
   
4. Optionally split the pattern into **Groups**, for example by team or office, and pick from your saved **Shift block**s **(4)**.
   
5. Click **Add** under each day **(5)** to place a shift: times, breaks, working area, standard points and hours, and the check-in window. Click **Save** when you're done.
   

> Saving the pattern doesn't change shifts that already exist. On a fixed schedule, click **Rebuild from pattern** on the calendar to apply it to the open period.

Don't forget **Enrollment**: only people enrolled in the schedule get shifts, and only between their start and end dates.

## Build and check the shifts

Open the schedule from the **Schedule** menu.

![The Fixed Schedule calendar with the view switcher, Rebuild from pattern, More actions, the pattern mismatch banner, the health strip and a shift with a conflict marked](https://storage.googleapis.com/reworkv3-public/success/260930/DSXCXFSHnQjvOz7i3NPu66xUW1B7BuvsnHHds2isDHiG6r4Y3ThSScg8LDlSaw4b/img.if6FNHyyfkt4yIgHo5Qc9AThFRDPlXbBS7sXFVWHjq3wVtGj0MrYbW52BZAnXAMu.png)

1. Choose a view **(1)**: **Month grid**, **Week**, **Day timeline** or **List**. Coverage schedules also have a coverage board.
   
2. Click the main button **(2)** to create shifts. Its name depends on the type: **Rebuild from pattern** (fixed), **Generate** (contract) or **Fill coverage** (coverage). You can run it for everyone or just selected employees.
   
3. Extra actions live under **More actions** **(3)**.
   
4. A yellow banner **(4)** tells you when saved shifts no longer match the pattern.
   
5. The health strip **(5)** and the orange or red outlines **(6)** flag conflicts. Hover over the warning icon on a shift to see why.
   

You can also drag shifts to move them, right-click a shift to assign, unassign or duplicate it to next week, and copy a previous week.

| Conflict | What it means |
| --- | --- |
| **Double booking** (critical) | The same person has two overlapping shifts, even across schedules. |
| **Leave clash** (critical) | The shift falls on approved time off. |
| **Rest time** (critical) | Not enough rest between two days' shifts. |
| **Too many days in a row / overtime risk / non-workday** (warning) | Worth a look, but not blocking. |
| **Open slot** (info) | A shift nobody has taken yet. |

Critical conflicts within the same schedule stop **Generate** until you acknowledge them and give a reason.

## Publish, export and clean up

Click **More actions** **(1)**:

![The More actions menu on a schedule, with Publish, the export and import options and Clear schedule marked](https://storage.googleapis.com/reworkv3-public/success/260930/hDlwxNjVxWxec7RwLjr7c8F3vNWq002t0nOna5umtpWp1nnlbc16MRRccYxbNkBw/img.LIJ5SeDnCGaF9iGJgfd2kbzw5irlHoB9G2yWZOeNbEqNslBPjJFC1CKAc9XYNHxE.png)

- **Publish…** **(2)**: employees only see published shifts, and only published shifts count on the timesheet. Choose the range to publish. If you'd rather skip this step, turn on **Auto-publish shifts** in the schedule's **Overview**.
- **Export to CSV / Excel / PDF** and **Import from CSV** **(3)**: move rosters in and out.
- **Clear schedule** **(4)**: removes shifts in a date range. Shifts in a locked period are never touched.

## Handle shift requests

On contract schedules, staff can **swap**, **claim**, **transfer**, **return** or **propose** shifts. Requests appear in **Schedule** → **Shift Requests**, with tabs **Mine**, **On my turn**, **My Team** and **All**. Each request follows the rules set in the schedule's **Shift Requests** settings: who approves, how fast, and whether short changes are approved automatically.

\[IMAGE: people-ops/timesheet/images/timesheet-schedules-06.png | Schedule > Shift Requests (All tab) once real requests exist: mark the Mine / On my turn / My Team / All tabs, the status and request-type filters, and one request row with its Status, Approval and Type\]

## Good to know

- Shifts you edit by hand on a fixed schedule are kept when you rebuild from the pattern.
- Once a timesheet period is locked, its shifts can't be generated, edited or cleared.
- Each schedule has its own color, set in **Overview**. It's used everywhere the shift appears. 🎨

## Related articles

- [Get started with Timesheet](https://support.rework.com/article/timesheet-getting-started)
- [Timesheets, pay rules and log matching](https://support.rework.com/article/timesheet-timesheets)
- [Check-in channels and logs](https://support.rework.com/article/timesheet-check-in)
- [Time off requests](https://support.rework.com/article/timesheet-time-off)
