# Understanding probability

Learn how stage and deal probability work, which one wins, and how Rework Sales turns them into weighted and projected value.

Source: https://support.rework.com/article/understanding-probability

A deal worth $120,000 in Discovery isn't the same as a deal worth $120,000 in Negotiation. **Probability** is how Rework Sales tells them apart: a percentage that says how likely a deal is to be won, so the app can weigh every deal by how close it really is. Get it right and the numbers at the top of your board stop being wishful. Here's how the two kinds of probability work and where the weighted numbers come from.

## Two kinds of probability

|  | **Stage probability** | **Deal probability** |
| --- | --- | --- |
| **Belongs to** | A stage in a pipeline | One deal |
| **Set by** | Pipeline owners and app admins | Anyone who can edit the deal |
| **Where** | **Edit pipeline**, the **Probability** field of each stage | The deal page, the pencil next to **Probability** |
| **Applies to** | Every deal sitting in that stage | Only that deal |
| **Changes when** | An admin edits the stage | Someone edits the deal |

**Stage probability** is your sales methodology written down. In Northwind's **New Business** pipeline it climbs with each step:

| **Stage** | **Probability** |
| --- | --- |
| Discovery | 10% |
| Qualification | 25% |
| Proposal | 50% |
| Negotiation | 75% |
| Verbal commitment | 90% |

**Deal probability** is the rep's judgment on one specific deal. Daniel's _Atlasworks – platform rollout_ sits in Proposal, so it follows the stage's 50%. If Maya Chen tells Daniel the budget is already signed off, he can raise that one deal to 70% without touching the stage.

## Which one wins

> **Note:** A deal probability, once set, always wins over the stage probability.

The deal page works out the number in this order:

1. If someone has set a probability on the deal, use it.
   
2. Otherwise, if the deal is **Won**, use 100%. If it's **Lost**, use 0%.
   
3. Otherwise, use the probability of the stage the deal is in.
   

A deal override stays put when the deal moves. If Daniel set 70% in Proposal and then moves the deal to Negotiation, it still reads 70%, not the stage's 75%. Want it to follow the stage again? Just clear the override (see Step 3 below).

### Step 1: Set the stage probabilities

- Open the pipeline's board and click **Edit pipeline** at the bottom of the menu.
  
- Turn on **Custom deal probability** in the header. The **Probability** fields stay greyed out until this switch is on.
  
- Type a number from 0 to 100 in each stage's **Probability** field. The stage header repeats it, for example _10% · 14 days_.
  
- Click **Save**.
  

![Edit pipeline with the Custom deal probability switch, a stage's Probability field and the stage header summary](https://storage.googleapis.com/reworkv3-public/success/260923/Vz0i6IFL7AVPg4jX6ZrA4scFXG0qb5ieK53HvSyR3T1S8i7y0OSk5NMw2hSjuWCu/img.QFgjGBsKrf5n2AG4XGjYd6c2zlijcLfk3pUjZb6CEI0KzrHsMT66Dxr4xm6Mn00P.png)

For a deeper look at changing stages, see [Edit pipeline stages](https://support.rework.com/article/edit-pipeline-stages).

### Step 2: Decide whether reps may override it

The same **Custom deal probability** switch decides whether a deal can carry its own number:

- **On**: reps see **Probability: N%** on the deal page with a pencil to change it, and the **Probability** column in the deal table can be edited in place.
  
- **Off**: the pipeline owns the number through its stages. The deal page hides the probability edit, and an override is refused.
  

Leave it on when your reps know things the stage can't, such as a signed budget or a lost champion. Turn it off when you want every forecast to follow one method with no exceptions.

### Step 3: Read and change a deal's probability

On the deal page:

- **Probability: N%** under the stage bar shows the deal's current number. Hover over it to see whether it's _Following the stage default_.
  
- Click the pencil next to it to open **Edit deal probability**. Type a value in **Probability (%)**, or leave it empty to follow the stage again. The hint tells you what the stage currently gives, for example _Leave empty to follow the stage (50%)_.
  
- The **Overview** card repeats the number next to **Probability**.
  
- The **Forecasts** card shows the deal's **Weighted value**.
  

![Deal page with the Probability pill, the Overview probability badge and the Forecasts weighted value](https://storage.googleapis.com/reworkv3-public/success/260923/xnDINpMFAviaUep5aD83f2EKWQGJsSBUX6ZDuqqhhGiIpFZBrZUpEJ9cEVcpIYDA/img.V3eWsQjfCOniirfo0G3jEuvb8gM3GYnLTtHAkdtKQtvxd4I5Lz1J3LZSeKvrBKvo.png)

## Weighted value and projected value

Probability turns a deal's value into what it's worth to your forecast today:

> **Weighted value = deal value × probability**

On _Atlasworks – platform rollout_, $120,000 × 50% gives a **Weighted value** of **$60,000 (50%)**, which is what you see on the deal's **Forecasts** card. If Daniel raised the deal to 70%, the card would show $84,000.

The board adds the same idea up for the whole pipeline. The strip at the top reads **N deals · Total: $X · Projected: $Y**:

- **Total** is the plain sum of every deal's value on the board.
  
- **Projected** is the sum of every stage's deal value multiplied by that **stage's** probability.
  

![Board toolbar with Total and Projected, and one stage column's value](https://storage.googleapis.com/reworkv3-public/success/260923/KbsnpuFC80zqRzBcKb6rgy3zhrvE1yPAwzNqIIonLmMX2G3cQCj12wAiH15iU8f6/img.2ihMebRFHsKbvhZ73XksbggwIjh91rJiUDiZkJKZ71WhybhpN5oQpv3smXjBVFRn.png)

Here's the New Business board from the picture, worked out by hand:

| **Stage** | **Deal value in stage** | **Stage probability** | **Projected** |
| --- | --- | --- | --- |
| Discovery | $42,000 | 10% | $4,200 |
| Qualification | $84,000 | 25% | $21,000 |
| Proposal | $210,000 | 50% | $105,000 |
| Negotiation | $75,000 | 75% | $56,250 |
| Verbal commitment | $60,000 | 90% | $54,000 |
| **Board** | **$471,000** |  | **$240,450** |

> **Warning:** **Projected** on the board uses stage probabilities only. A deal probability changes that deal's **Weighted value** on its own page, but not the board's **Projected** figure. If your reps override often, the two will disagree. That's expected, not an error.

The board totals follow the board's filters and view. Switch to a view that shows only Harry's deals, and **Total** and **Projected** describe only Harry's deals.

## Setting probabilities that mean something

- **Start from your history.** 💡 If three in ten deals that reach Proposal close, Proposal is 30%, not the 50% that feels right.
  
- **Keep the numbers rising.** A later stage with a lower probability than an earlier one makes **Projected** jump around as deals move forward.
  
- **Leave 100% for won deals.** Even Verbal commitment deals slip. Northwind uses 90%.
  
- **Review once a quarter.** Brian compares last quarter's closed deals with the stage probabilities and adjusts the ones that drifted.
  
- **Ask reps to explain overrides.** A note on the deal's work stream ("budget confirmed by Oliver Grant") makes a 70% on a Proposal deal easy to trust.
  

Related reading: [Understanding rotting days](https://support.rework.com/article/understanding-rotting-days) and the [Rework Sales glossary](https://support.rework.com/article/rework-sales-glossary).
