# Understanding rotting days

Find out what a rotting deal is, how to set a rotting limit on each pipeline stage, and how the SLAs page shows you which stages are falling behind.

Source: https://support.rework.com/article/understanding-rotting-days

A deal that sits in the same stage for too long is losing momentum. The customer's attention moves on, a competitor gets a meeting, and the chance of closing quietly drops. **Rotting days** give each stage a time limit, so you catch a stalled deal while there's still time to save it. Here's how rotting works and how to pick limits that fit your process.

## What "rotting" means

A **rotting limit** is the number of days a deal may stay in one stage before it counts as overdue. The clock starts when the deal joins the stage and restarts every time it moves to another one.

Take Northwind's **New Business** pipeline, where Proposal has a limit of 21 days. Daniel moves _Atlasworks – platform rollout_ into Proposal on October 1. Until October 22 it's on time. From October 23, if it's still in Proposal, it's breaching the stage's limit.

You can see when a deal joined its current stage on the deal page, in the **Deal flows** card, under **Joined stage at**.

> **Note:** The clock measures time **in the stage**, not time since the last activity. Logging a call keeps the relationship warm, but only moving the deal to another stage (or winning or losing it) resets the clock.

## Why set rotting limits

- **Catch stalled deals early.** A manager sees which stages are holding deals too long, before the quarter ends.
  
- **Agree on a pace.** A limit is a promise the team makes about how quickly each step should happen.
  
- **Give hand-offs a deadline.** When Hazel qualifies a lead and passes it to Daniel, a short limit on the next stage says how soon Daniel must pick it up.
  
- **Spot a broken stage.** If most deals in one stage are overdue, the limit is probably too short, or the stage hides a step your process doesn't show.
  

### Step 1: Set a limit on a stage

Rotting limits are set per stage in the stage builder:

- Open the pipeline's board and click **Edit pipeline** at the bottom of the menu.
  
- In a stage column, turn on **Rotting in (days)** and type the number of days.
  
- The stage header sums it up next to the probability, for example _50% · 21 days_. A stage with the switch off reads _No rotting_.
  
- Click **Save**.
  

![A stage column with the Rotting in (days) switch and days field, and a stage header showing its limit](https://storage.googleapis.com/reworkv3-public/success/260923/az9Jx4aeZBVSmCzFnwdNZos1eS8mGjxzSBC4KsmKHXbvx1clSj5aVIQrNpMRdRdt/img.lC6R5f3A2bQIqM1BWo4sPJsMLwAH7cwP0A41MfzAWWMtj6JKqYtg2YZccopXGB7n.png)

Each stage has its own limit, and a stage can have none at all. For the full stage builder, see [Edit pipeline stages](https://support.rework.com/article/edit-pipeline-stages).

### Step 2: Watch breaches on the SLAs page

- Open the pipeline and click **SLAs** at the bottom of the menu.
  
- The cards at the top show **Active deals**, **Breaching SLA** (deals in a stage past its rotting limit) and **Stages with SLA**.
  
- The **Stage SLAs** table lists every stage with its **SLA (rotting)** limit, the number of **Deals** in it, the **Avg days in stage** and how many are **Breaching**.
  

![SLAs page with the Breaching SLA card and the SLA (rotting) column](https://storage.googleapis.com/reworkv3-public/success/260923/e7KMmUTzqz6SKdzguJv8WsMUsF7wO1zdxViGOMVA4sHqQc5oBQLsOwXPYszgi0cz/img.ogoDqudT77GWPQqNygkuVXSvLiEXz8h20cyWkAWAdytVYZaI6Dof9zIOCgazebGh.png)

Read the table from right to left. A stage with a high **Breaching** count is where to look first. If its **Avg days in stage** is close to the limit even when nothing is breaching yet, that stage is about to become a problem.

The SLAs page counts active deals only. A won or lost deal no longer rots.

## Choosing limits by stage type

The right limit follows the natural rhythm of each stage. Fast, rep-driven stages get short limits. Stages that wait on the customer's own process get longer ones, but never so long that a dead deal can hide in them.

| **Stage type** | **Example stages** | **Suggested limit** | **Why** |
| --- | --- | --- | --- |
| Hand-off | Hazel passes a qualified lead to Daniel | 2–5 days | The receiving rep must pick it up quickly, or the lead goes cold |
| Early discovery | Discovery, Qualification | 7–14 days | The rep controls the pace. Long gaps mean no one is working the deal |
| Proposal | Proposal, Joint proposal | 14–21 days | The customer needs time to review, but a proposal nobody discusses is fading |
| Negotiation | Negotiation, legal review | 10–14 days | Contracts wait on legal and procurement, yet high-value deals need steady attention |
| Closing | Verbal commitment | 5–7 days | A verbal yes that isn't signed within a week is a warning sign |

Northwind's New Business pipeline uses 14 days for Discovery, Qualification and Negotiation, 21 days for Proposal and 7 days for Verbal commitment.

## Good habits

- **Start generous, then tighten.** 💡 Set limits a little longer than today's average and shorten them once the team keeps up.
  
- **Review the SLAs page weekly.** Harry opens it in his Monday pipeline review and asks the owner of every breaching deal for a next step.
  
- **Move deals honestly.** A deal moved forward just to reset the clock hides the problem. Pair rotting limits with the rules that stop deals from skipping stages. See [Move a deal through stages](https://support.rework.com/article/move-a-deal-through-stages).
  
- **Use it with probability.** A 90% deal that has been in Verbal commitment for a month isn't really 90%. See [Understanding probability](https://support.rework.com/article/understanding-probability).
