# Wait before the next step

Pause a run for a while, until a date or until a time of day, and let it carry on by itself afterwards.

Source: https://support.rework.com/article/wait-before-the-next-step

Not everything should happen at once. A welcome email is better followed by a check-in a few days later, a reminder should land the morning before the deadline, and a follow-up sent one minute after the first message reads like a machine. The **Wait** step pauses the run and lets it carry on by itself when the time comes.

## Step 1: Add the step and choose a mode

- Click the **+** where the pause belongs and pick **Wait**.
  
- Open it and choose a **Mode**:
  

| Mode | Waits |
| --- | --- |
| **Delay for a set amount of time** | A number of minutes, hours or days from now |
| **Delay until a specific date** | Until an exact date and time you enter |
| **Delay after a date property** | A set time after a date that came from an earlier step, for example three days after a contract's signature date |

![The Wait step with its three modes, its duration and the optional time of day](https://storage.googleapis.com/reworkv3-public/success/260923/LNR1LOdtxT3HCS5lG8a6JylvLqI3GtNygNsCDGwHx2gLBDSmpRqQqGZ09lJmmnKc/img.dQmIXM801wSQElPWvGcZQqLzxvBNLia81McIZdY1kFGdi1Ix7uKC1ilTdKWSL48h.png)

## Step 2: Set the length

For a set amount of time, fill in **Duration** and **Unit**, for example `3` and **days**.

Two optional fields make the landing time predictable:

- **Time of day**: the hour the run should continue at, rather than whatever time the pause happens to end.
  
- **Timezone**: the timezone that hour is read in. Leave it empty to use the run's own timezone.
  

## Step 3: Know what a waiting run looks like

While a run sits on a **Wait** step:

- The run's status is **Enrolled**, not **Completed**. It hasn't finished yet.
  
- The **Wait** step shows **Pending**, and its result says when it will continue, for example _Waiting until 9/17/2026, 7:13 AM_.
  
- The steps below it haven't run.
  

![A run parked on a Wait step, with the date it continues](https://storage.googleapis.com/reworkv3-public/success/260923/3bZ7bpJ8zeMQvfKx8u7C2l4Mhqg2llsAGIoINPdKjpFk1KUpDBYhUOHwwPDlbVOY/img.ULX8VsXue73OTDSorG3ElEvY92DAARjnf6X9PdPdpiTDsUWdIWbku4YQEAaaZ6wi.png)

When the deadline arrives, the run picks up where it left off and finishes on its own ✅ Publishing a change in the meantime doesn't affect it: a run keeps the flow it started with.

> **Note:** A **Schedule** trigger fires on a day, not at an hour. Adding a **Wait** right after it is the way to land on a specific time of day. See [Run a flow on a schedule](https://support.rework.com/article/run-a-flow-on-a-schedule).
