Timeline view

Plan tasks as bars on a calendar, link them with dependencies, and see each parent task's sub-tasks wrapped in one bracket.

A list tells you what's due. A timeline shows you what happens when something slips. The Timeline view draws every task on a board as a bar from its start date to its deadline, links tasks that depend on each other, and wraps a parent's sub-tasks in a bracket. You get to see the whole plan, and move it just by dragging.

Step 1: Open the Timeline and set the time period

Open a board and click the Timeline tab. Then use the toolbar:

  • The time period dropdown: Week, Month, Quarter or Year fix how much of the calendar one screen holds. Flexible lets the zoom buttons move smoothly from one period to the next.

  • Today: scroll the chart back to today.

  • − and +: zoom out and in. In a fixed period they narrow or widen the columns. In Flexible they cross into the next period when you pass the limit.

The time period menu open, with Today and the zoom buttons

Step 2: Read the chart

  • The button at the left of the toolbar hides or shows the task table, the column of task names and groups. Hide it to give the chart the whole width.

  • The vertical line marks today.

  • Each bar runs from the task's start date to its deadline. The avatar next to it is the assignee. Hover a bar for a preview card with the dates, duration, owner, assignee and priority, and click it to open the task.

  • Drag a bar to move both dates, or drag either end to change just the start or the deadline.

The timeline in Month with the task table toggle, the today line and a task bar

Step 3: Link tasks with dependencies

A dependency says one task has to wait for another. Hover a bar and small handles appear at both ends. Drag from one bar's handle to another bar:

Drag fromToTypeMeans
The finish of AThe start of BFS Finish-to-StartB can't start until A finishes
The start of AThe start of BSS Start-to-StartB can't start until A starts
The finish of AThe finish of BFF Finish-to-FinishB can't finish until A finishes

The connector carries a tag with its type. A red tag means the dates break the rule, for example Color palette starts before Moodboards finishes.

Dependency connectors on the timeline with their FS and SS tags

Step 4: Check or change a dependency

Click a connector's tag to open it:

  • PREDECESSOR and SUCCESSOR name the two tasks, with a sentence that spells out the rule.

  • Satisfied or Not satisfied says whether the current dates respect it, and why.

  • Type: switch between FS, SS and FF.

  • Remove: delete the dependency. Don't worry, the tasks themselves stay.

The dependency popover with the predecessor and successor, the type switch and Remove

Step 5: See sub-tasks under their parent

When a task has sub-tasks, the task table nests them under it. On the chart, a dashed summary bracket wraps the parent and its sub-tasks, so you can see the span of the whole piece of work at a glance. For example, Brand guide draft wraps Guide layout and Guide copy.

Brand guide draft with its sub-tasks in the task table and the summary bracket on the chart

Step 6: Choose what the timeline shows

Click Customize view. Under DISPLAY:

  • Show undated tasks: list tasks with no start date or deadline. They appear without a bar.

  • Show task table: the same as the toggle button in the toolbar.

  • Show summary bracket: the dashed bracket around a parent's sub-tasks.

Under FIELDS, pick the columns the task table shows next to the name. Like any view change, these only stick once you click Save view. See Filter, group and save a view.

The Customize view panel for a timeline with the three display switches

Step 7: Schedule an undated task

With Show undated tasks on, a task with no dates sits in its group with an empty row. Hover the row on the chart and a Drag to schedule marker follows the cursor. Drag across the days the task should take, and the start date and deadline are set from where you start and stop. 💡

An undated task in the task table and the Drag to schedule marker on its row

Note: The timeline plans tasks on one board. To lay out the project's big phases and milestones, use the Roadmap.