Understanding probability
Learn how stage and deal probability work, which one wins, and how Rework Sales turns them into weighted and projected value.
A deal worth $120,000 in Discovery isn't the same as a deal worth $120,000 in Negotiation. Probability is how Rework Sales tells them apart: a percentage that says how likely a deal is to be won, so the app can weigh every deal by how close it really is. Get it right and the numbers at the top of your board stop being wishful. Here's how the two kinds of probability work and where the weighted numbers come from.
Two kinds of probability
| Stage probability | Deal probability | |
|---|---|---|
| Belongs to | A stage in a pipeline | One deal |
| Set by | Pipeline owners and app admins | Anyone who can edit the deal |
| Where | Edit pipeline, the Probability field of each stage | The deal page, the pencil next to Probability |
| Applies to | Every deal sitting in that stage | Only that deal |
| Changes when | An admin edits the stage | Someone edits the deal |
Stage probability is your sales methodology written down. In Northwind's New Business pipeline it climbs with each step:
| Stage | Probability |
|---|---|
| Discovery | 10% |
| Qualification | 25% |
| Proposal | 50% |
| Negotiation | 75% |
| Verbal commitment | 90% |
Deal probability is the rep's judgment on one specific deal. Daniel's Atlasworks โ platform rollout sits in Proposal, so it follows the stage's 50%. If Maya Chen tells Daniel the budget is already signed off, he can raise that one deal to 70% without touching the stage.
Which one wins
Note: A deal probability, once set, always wins over the stage probability.
The deal page works out the number in this order:
If someone has set a probability on the deal, use it.
Otherwise, if the deal is Won, use 100%. If it's Lost, use 0%.
Otherwise, use the probability of the stage the deal is in.
A deal override stays put when the deal moves. If Daniel set 70% in Proposal and then moves the deal to Negotiation, it still reads 70%, not the stage's 75%. Want it to follow the stage again? Just clear the override (see Step 3 below).
Step 1: Set the stage probabilities
Open the pipeline's board and click Edit pipeline at the bottom of the menu.
Turn on Custom deal probability in the header. The Probability fields stay greyed out until this switch is on.
Type a number from 0 to 100 in each stage's Probability field. The stage header repeats it, for example 10% ยท 14 days.
Click Save.

For a deeper look at changing stages, see Edit pipeline stages.
Step 2: Decide whether reps may override it
The same Custom deal probability switch decides whether a deal can carry its own number:
On: reps see Probability: N% on the deal page with a pencil to change it, and the Probability column in the deal table can be edited in place.
Off: the pipeline owns the number through its stages. The deal page hides the probability edit, and an override is refused.
Leave it on when your reps know things the stage can't, such as a signed budget or a lost champion. Turn it off when you want every forecast to follow one method with no exceptions.
Step 3: Read and change a deal's probability
On the deal page:
Probability: N% under the stage bar shows the deal's current number. Hover over it to see whether it's Following the stage default.
Click the pencil next to it to open Edit deal probability. Type a value in Probability (%), or leave it empty to follow the stage again. The hint tells you what the stage currently gives, for example Leave empty to follow the stage (50%).
The Overview card repeats the number next to Probability.
The Forecasts card shows the deal's Weighted value.

Weighted value and projected value
Probability turns a deal's value into what it's worth to your forecast today:
Weighted value = deal value ร probability
On Atlasworks โ platform rollout, $120,000 ร 50% gives a Weighted value of $60,000 (50%), which is what you see on the deal's Forecasts card. If Daniel raised the deal to 70%, the card would show $84,000.
The board adds the same idea up for the whole pipeline. The strip at the top reads N deals ยท Total: $X ยท Projected: $Y:
Total is the plain sum of every deal's value on the board.
Projected is the sum of every stage's deal value multiplied by that stage's probability.

Here's the New Business board from the picture, worked out by hand:
| Stage | Deal value in stage | Stage probability | Projected |
|---|---|---|---|
| Discovery | $42,000 | 10% | $4,200 |
| Qualification | $84,000 | 25% | $21,000 |
| Proposal | $210,000 | 50% | $105,000 |
| Negotiation | $75,000 | 75% | $56,250 |
| Verbal commitment | $60,000 | 90% | $54,000 |
| Board | $471,000 | $240,450 |
Warning: Projected on the board uses stage probabilities only. A deal probability changes that deal's Weighted value on its own page, but not the board's Projected figure. If your reps override often, the two will disagree. That's expected, not an error.
The board totals follow the board's filters and view. Switch to a view that shows only Harry's deals, and Total and Projected describe only Harry's deals.
Setting probabilities that mean something
Start from your history. ๐ก If three in ten deals that reach Proposal close, Proposal is 30%, not the 50% that feels right.
Keep the numbers rising. A later stage with a lower probability than an earlier one makes Projected jump around as deals move forward.
Leave 100% for won deals. Even Verbal commitment deals slip. Northwind uses 90%.
Review once a quarter. Brian compares last quarter's closed deals with the stage probabilities and adjusts the ones that drifted.
Ask reps to explain overrides. A note on the deal's work stream ("budget confirmed by Oliver Grant") makes a 70% on a Proposal deal easy to trust.
Related reading: Understanding rotting days and the Rework Sales glossary.