Add and manage views

See the same board as a table, a list, a kanban, a timeline or a calendar, and keep the tabs in the order your team actually uses.

One board, many ways to look at it. A project manager wants the whole list with dates and owners, a designer wants a kanban of what's in review, and the client call needs a timeline. Views are tabs on a board that show the same tasks in different layouts, each with its own grouping, filters and columns. Changing a view never changes the tasks, so everyone can keep the view that suits them.

Note: Adding, renaming, hiding and deleting views is for people who can manage the project. Everyone on the project can switch between the views that are shown.

Step 1: Find the view tabs

Open a board. The tabs next to the board name are its views. A Tasks board starts with Table, List, Board, Timeline and Calendar. Click a tab to switch, and click + at the end of the strip to add a view.

The view tab strip on a Tasks board with the Add view button

Step 2: Add a view

In the Add view dialog:

  • View name: what the tab says, for example Design review.

  • Type: how the view lays out the tasks:

TypeShows tasks as
TableRows and columns, like a spreadsheet
ListA compact list grouped into sections
BoardKanban columns you drag cards between
TimelineBars on a calendar, with dependencies. See Timeline view
CalendarTasks on their dates in a month or week grid. See Calendar and assignment views
AssignmentsTasks gathered under each person
WorkloadsBooked effort per person over time
PeopleThe team with the work each person holds
AllocateEffort to spread across people and dates
  • Group by: for a Board view, the column that buckets the cards, for example Stage, Status, Priority or Assignee.

Click Add view. The new tab opens straight away. Display options such as fields and colours come after, from Customize view. See Filter, group and save a view.

The Add view dialog with View name, Type, Group by and the Add view buttonThe new Design review view open as a board grouped by assignee

Step 3: Use the view menu

Click ••• on the active tab to open View actions:

  • Set as default: make this the tab the board opens on. The current default shows Default view instead.

  • Duplicate view: copy the view with its settings, then change the copy.

  • Rename: change the tab name. Only for views you added.

  • Hide view: remove the tab from the strip without deleting it. The default view can't be hidden.

  • Delete view: remove a view you added. The built-in views can be hidden but not deleted.

The View actions menu on the Design review tab

Step 4: Arrange all views at once

Open Board actions (⋯ at the top right of the board) and click Manage views. The dialog lists every view in one order:

  • Drag a row by its handle to move the tab in the strip.

  • Click the star to make a view the default.

  • Rename and Delete appear on views you added. Built-in views show Built-in.

  • Use the switch on each row to show or hide the tab.

Manage views with the drag handles, the default star, rename and delete, and the show switches

At the bottom:

  • Turn on Always show the default (starred) view first in the tab strip to pin the default tab to the front, whatever the order.

  • Click Add view to add another tab from here.

  • Click Done to close.

The default-first switch, Add view and Done at the bottom of Manage views

Note: The default view can't be hidden. Want to hide it? Star another view first. 💡