Capacity and workload views
See how much work each person is carrying, spot the weeks that are over capacity, and check your own bookings.
Bookings tell you what a project needs. Capacity tells you whether the people you have can actually deliver it. The workspace Workloads page puts every booking in the studio on one calendar, colours each day by how full it is, and lets you fix an overload by dragging work instead of rebuilding a spreadsheet. Here's how to read it, and where to find the same numbers per board and for yourself.
Step 1: Open the workspace Workloads page
Click Workloads at the bottom of the left sidebar. The toggle at the top right switches between Overview and Capacity.
Overview answers "how much work is booked, and what state is it in":
The tiles across the top give RECORDED hours, how many PEOPLE recorded time in the window, AVG UTILIZATION and OVER ESTIMATE, the count of entries above plan.
Workload pipeline counts records and hours at each status, planned to booked to recorded.
Where the hours go splits the same effort by workload type, and Recent time entries lists what was recorded last.
Capacity answers the other question: can the team fit it?

Step 2: Read the capacity board
Switch to Capacity. Each row is a person, each column is a day.
Today and the arrows move the window, and the range beside them tells you which days you're looking at.
No date collects the bookings that have no dates yet, so they're never silently ignored.
Filters narrows the board and holds the capacity settings.
The legend gives the colours: On track, Near capacity, Over and Non-working.
Each person's row shows how many items they hold, their daily average, and hours booked against hours available, for example 78h 51m / 120h.
Show unscheduled reveals the undated effort for that person, with how much it would add.
Expand a person to see their individual bookings as bars. Drag a bar to move the work, or drag its edge to resize it.

Note: A day's fill is planned effort as a share of that day's real capacity, which is working hours minus time off. A solid red cell with no percentage is work booked on a non-working day.
Step 3: Tune what the board counts
Open Filters to reach the capacity settings:
READ EFFORT FROM: By workload item reads each booking on its own period and assignee. By task reads the effort on the tasks instead.
WORKLOAD ITEM STATUS: limit the board to Planned, Booked or Recorded. Selecting none includes every live status, and cancelled records are never counted.
ROWS: Show unassigned row adds one row at the bottom for work nobody is assigned to.
DISTRIBUTION: Spread over working days only keeps effort on each person's working days. Turn it off and effort spreads across every calendar day, which puts load on weekends.
Click Apply.

Step 4: Set the working calendar
Capacity is only as honest as the working week behind it, and the week is set per person. Click the small calendar icon on someone's row to open Working calendar:
COMMON WEEKS offers ready-made patterns: MonβFri Β· 8h, MonβFri 8h + Sat morning 4h, MonβSat Β· 8h and MonβFri Β· 4h.
HOURS PER DAY sets each weekday individually. A 0 is a non-working day, and half days are allowed, so a Saturday morning is 4.
The line underneath totals it up, for example 40h per week Β· 5 working days.
Click Save calendar.

Step 5: Open one person's page
Click a person on the capacity board to open their page:
The card at the top gives their role and email, the hours they recorded in the Last 12 weeks, how many Records that came from, and a chip per workload type with the hours against it.
The table underneath lists each WORKLOAD, the WORK ITEM it belongs to, the TIME on it and the date it was RECORDED.
Use it for a one-to-one, or to check whether someone who looks overloaded this week is actually finishing things.

Step 6: Check effort on a board
A board has its own views for the same question, scoped to one board's tasks. Open a tasks board and pick a view from the secondary tabs:
| View | What it answers |
|---|---|
| Assignments | Who is on each task. See Calendar and assignment views. |
| Workloads | Planned against actual effort, grouped by workload type. |
| Allocate | How tracked time has been spread across bookings, task by task. |
Workloads opens with the board's totals: Planned, Actual as a percentage of plan, and how many Records make it up. Under that, records are grouped by workload type with the planned effort per group, and a recorded row shows its plan, its actual and its status side by side.

Allocate is the bulk version of logging time to a workload: every task on the board in one table, under TASK, TRACKED, ALLOCATED and LEFT, with a Total row at the bottom. A negative LEFT means more has been allocated to bookings than was ever tracked on the task.

Step 7: Check your own workloads
Open My Works and click Workloads for your own bookings only:
The first card gives your PLANNED EFFORT, the share of it already recorded, and counts of BOOKINGS, RECORDED and PROJECTS.
BY PROJECT splits that effort across the projects you're booked on.
SUMMARY totals your planned effort, how many bookings are recorded, and the split between Booked and Recorded.
π‘ This is the view to open before you say yes to one more thing.

Effort that has been recorded is what turns into cost. See Book workloads for the bookings behind these views, and Read the P&L report for what they cost.