Track time and log it to workloads

Run the timer while you work, log hours by hand when you forget, and turn tracked time into the actual effort on a booking.

Tracked time only pays for itself if it reaches the numbers the studio is judged on. Rework keeps the two jobs separate on purpose: the timer records what you did with your day, and a workload booking records what the project is charged for. Logging time to a workload is the deliberate step between them, so a long Tuesday doesn't silently become a cost overrun. Here's how to run the timer, log time by hand and move it onto a booking.

Step 1: Start a work session from the header

The timer lives in the app header, next to the notification bell, and follows you across every page.

  • Click the timer icon to open the panel.

  • Type what you're doing in What are you working on?

  • Optionally, use Link a task (optional) to bind the session to a task before it starts, so the time lands on the right work without a second step.

  • Click Start.

The header timer icon and the open panel with What are you working on and the Start button

Note: You can also start from a task. On a task, Start opens a session already bound to it, and Add to sessions parks it in your queue without starting the clock.

Step 2: Watch the clock in the header

Once a session is running, the icon becomes a pill showing the elapsed time, visible on every screen. The controls beside it act on the session on the clock:

  • Pause keeps the time already on the session and stops counting.

  • Stop & log ends the session and writes it to your time logs.

The running timer pill in the header with its pause and stop controls

Step 3: Pause, resume and stop from the panel

Click the clock on the pill to open the panel. The card at the top, headed NOW TRACKING, speaks for the session on the clock:

  • Pause holds it, and the same button then reads Resume.

  • Stop asks Stop and log this session? before it commits, because the session is gone afterwards.

  • SESSIONS below lists everything parked behind the running one, and one click switches the clock onto any of them.

  • What's next? with Add starts or parks another session without leaving the panel.

The timer panel with the NOW TRACKING card, the Pause and Stop buttons and the sessions queue

Step 4: Review your sessions in My Works

Open My Works and click Work Sessions to see your own tracking: sessions grouped by day, with a Week Summary giving Total time, Working time, Break time, the daily average, the number of Sessions and how many days were active.

This page is just for you. To see effort across the team, use the workload and capacity views.

The Work sessions page in My Works with the week summary

Step 5: Open Tracking on a task

Everything a task costs is gathered in one collapsible Tracking section on the task, with a summary line of planned against actual. Open a task and expand Tracking. It has three tabs:

TabWhat it holds
WorkloadsThe effort bookings made against this task, with Log workload to add one.
TimeThe work sessions logged on this task, with Add time and Log to workload.
CostsDirect expenses logged against this task.

Once a task has something on it, each tab carries a count and the section header shows a one-line summary, for example 2d planned ยท 0%.

The Tracking section on a task with the Workloads, Time and Costs tabs

Step 6: Add time by hand

Forgot to start the clock? No problem. Open the Time tab and click Add time:

  • Enter the hours in Hrs.

  • Say what you did in What did you work on?

  • Set the date and time the work started.

  • Click Log time.

The entry joins the list under its day, and Total logged at the top adds it up.

The Add time composer on the Time tab with the hours, the note and the Log time button

Step 7: Log the time to a workload

Tracked hours don't touch project cost on their own. Log to workload is the step that turns them into actual effort on a booking.

  • Click Log to workload on the Time tab.

  • The top of the dialog shows how much is logged on this task, and how many sessions and people it came from.

  • Each of the task's workload bookings gets a row. Type how much of that time should count against it, in the booking's own unit, for example 0.75 of a day.

  • The bar compares what you've Allocated with what was logged, and warns you when you go over.

  • Click Record.

Each booking's actual effort is set to the quantity you typed, and its actual cost to that quantity at the booking's cost rate. This is a guide, not a rule: allocate only the time that should count toward cost, and time spent but not billable simply stays in the time logs.

The Log time to workloads dialog with the logged total, a booking allocation row and the Record button

Note: A task with no workload bookings has nothing to record into. Book one first from the Workloads tab with Log workload, or see Book workloads.

Once recorded, the booking shows its actual in the Recorded column on the project's Workloads and Costs pages, and the difference between booked and recorded is what the P&L report reads as margin.