Project health and check-ins

Share how a project is really doing with a quick check-in, and read its health on the Overview, the check-in trail and your project lists.

A project's numbers can look fine while the people running it know it's slipping. A client has gone quiet, a key file is late, a launch date is at risk. Check-ins let the project manager say so in one click: a status, a progress figure and a short summary. Every check-in also freezes a snapshot of the project's numbers at that moment, so anyone can see later what was known and when. Here's how to file one and where project health shows up.

Health at a glance

A project's health is one of three labels:

StatusUse it when
On trackThe project will meet its dates and budget as planned
At riskSomething could make it miss a date or go over budget, but it can still be recovered
Off trackIt will miss a date or its budget unless the plan changes

Health comes from the latest check-in. A project with no check-in yet shows a health worked out from its score instead, so every project has a label from day one.

Step 1: Find the project's status

Open the project. The right side of the Overview shows its health:

  1. The health label of the latest check-in, for example At risk.

  2. Update status opens a new check-in.

  3. The status card: health, percent complete, the Summary, and who reported it and when.

Q4 Campaign Launch Overview with the At risk label, Update status and the status card

Step 2: File a check-in

Click Update status. The New check-in form opens for the current project.

  1. Status: Choose On track, At risk or Off track.

  2. Progress: Drag the slider to how complete the project is right now.

  3. Summary: Write what changed, what's blocking the project and what happens next.

  4. Click Update status.

New check-in form with At risk, 60% progress and a summary

For example, Harry runs the Q4 Campaign Launch. The social ad set is now approved, but the landing page copy is still with the client. He files At risk at 60%, and says the launch may slip by a week.

Note: In most teams the project owner files a check-in each week, or whenever the picture changes.

A good summary answers three questions in two or three sentences:

QuestionExample
What changed?Social ad set is approved.
What is blocking us?Landing page copy is still with the client.
What happens next?Launch may slip by a week unless copy arrives by Friday.

Step 3: Read the updated status

After you file, the Overview updates right away:

  1. The status card shows the new check-in: At risk ยท 60% complete, the summary, and your name.

  2. Earlier check-ins lists the previous reports with their status and progress. Click View all to open the full trail.

Overview after filing, with the new status card and Earlier check-ins

Step 4: Review the check-in trail

Click Update status in the project menu to open the Check-ins panel. It lists every report on the project, newest first.

  1. Each check-in shows its status, date, Progress, summary, and who filed it.

  2. At the time of this report is a snapshot frozen when the check-in was filed: Completion, Overdue tasks, Recorded cost, and milestones when the project has them.

Check-ins panel with two reports and their snapshots

The snapshot never changes afterwards. In this example, the earlier report recorded $0 cost, while the new one recorded $2.9K. Comparing snapshots shows how the project moved between two reports, even if tasks were edited later.

Note: The progress you enter is your own judgement. The snapshot's Completion is calculated from tasks. When the two differ a lot, it's worth asking why.

Step 5: Compare health across projects

Health appears wherever projects are listed, so you can spot trouble without opening each one.

  • On Projects, switch to Board. Each card shows its health label and progress bar.

  • In List and Table, the progress ring next to each project takes the color of its health.

  1. At risk on Q4 Campaign Launch, from Harry's check-in.

  2. On track on Atlasworks Website Redesign.

Projects board with health labels on each project card

To see every check-in across a service, open the service and click Update status under Cost & Control. Reports from all its projects are grouped by project, and you can file a New checkin for any of them from there.

Tips for useful check-ins

  • Keep a rhythm. A check-in every week, on the same day, makes the trail easy to read.

  • Change the status early. At risk is a request for attention, not an admission of failure. It gives Eric or Brian time to help.

  • Write for someone who wasn't in the meeting. Name the blocker and the next step, not just "in progress".

  • Don't wait for a perfect number. A rough progress figure with an honest summary is more useful than no report at all.

Health tells you how a project is doing. Its stage tells you where it is. See Project stages and item stages.