Project stages and item stages
Learn the difference between the stages a whole project moves through and the stages a single task moves through, and how to design both.
"Where are we?" means two different things. A manager asks it about a whole project: is the Atlasworks website still in design, or already in build? A designer asks it about one task: is the hero section still a brief, or waiting on the client? Rework Projects answers both with two separate sets of stages, so a project's progress and a task's progress never get mixed up. This article explains each set, how they relate to status, and how to design them for a service.
Two stage sets at a glance
| Project stages | Item stages | |
|---|---|---|
| Describe | Where a whole project is in its plan | Where one task is in its workflow |
| Apply to | Projects in the service | Tasks and other items on a project's boards |
| Sit inside | The project's Active status only | One of five lifecycle statuses: Draft, Active, Done, Failed, Discarded |
| Example | Discovery, Design, Build, Launch | Backlog, Brief, In design, Client review, Approved |
| Where you see them | The service's projects on a Board grouped by Stage | The Stage column and grouping on a task board |
| Where you edit them | Service Settings > Project stages | Service Settings > Project items > Item stages |
Both sets belong to the service, so every project in the service shares them. Only a service owner or an app admin can change them.
Project stages
Project stages break a project's active life into the big phases a manager tracks. They only apply while a project is Active: a project that's still open, finished or archived has no stage.
To see them, go to Settings > Services, click the service and open Project stages.
Project stages in the service settings menu.
The Active band. Every project stage lives inside it. Click Add to create one.
The stages in order. Use the arrows to reorder, click a row to rename or recolor it, or click the bin to remove it.

Note: The description on this page calls them "plan stages". Don't let that confuse you: plan stages and project stages are the same thing.
See projects by stage
Open the service from the sidebar and switch its projects to Board. The board groups projects by Stage, one column per project stage.
The grouping menu, set to Stage. You can also group by Status or Priority.
One column per stage, with the projects currently in it.

At Northwind Studios, Eric can see at a glance that one project is in Discovery, one in Design and one in Build, without opening any of them.
Item stages
Every task has a lifecycle status, and that status is what reports and filters count:
| Status | Means |
|---|---|
| Draft | Not yet started |
| Active | Work in progress |
| Done | Completed successfully |
| Failed | Did not complete |
| Discarded | Dropped or no longer relevant |
Item stages add finer steps inside a status. A task in Active can be at Brief, In design or Client review. All three still count as Active. When a status has no stages, tasks use the status directly.
To see them, open the service settings and click Project items. Item stages is the top half.
Each lifecycle status is a band, for example Draft, with its description.
The stages inside Active for Client Design Projects: Brief, In design and Client review.
Done holds Approved. Failed and Discarded have no stages, so tasks use those statuses directly.

Click Add next to a status to create a stage in it. Drag a stage to reorder it within its status, then click Save changes. A stage can't move to another status, because that would change what it means.
See tasks by stage
On a project's Tasks board, the Table view shows both values side by side:
Status: the lifecycle status, such as Active or Done.
Stage: the item stage inside that status, such as Brief or Approved.

For example, Visual design system is Active at the Client review stage, while Stakeholder interviews is Done at Approved.
To lay out a board by stage, click Group and choose Stage.
How the two sets work together
The two sets are independent. A project's stage doesn't move its tasks, and a task's stage doesn't move its project. Here's the Atlasworks Website Redesign on one day:
| Level | Status | Stage |
|---|---|---|
| Project: Atlasworks Website Redesign | Active | Design |
| Task: Stakeholder interviews | Done | Approved |
| Task: Homepage wireframes | Active | In design |
| Task: Visual design system | Active | Client review |
| Task: Build homepage templates | Draft | none |
Quinn moves the project to Build when design is signed off. Jolie moves her own tasks through Brief, In design and Client review as she works.
Design tips
Keep project stages few and coarse. Three to six stages that match how you talk to clients, such as Discovery, Design, Build and Launch. If a stage lasts a day, it belongs on the tasks instead.
Name item stages after who has the ball. Client review tells everyone the task is waiting on the client, which a plain Active doesn't.
Put stages only where people need the extra detail. Most teams need stages in Active and perhaps one in Draft, such as Backlog. Leave Failed and Discarded without stages.
Don't repeat the status. A stage called Done inside Done adds nothing.
Agree on the stages before projects start. Renaming is safe, but removing a stage that tasks are sitting on leaves them to be moved by hand.
To set stages up for a new service, see Create a project service. To report how a project is doing beyond its stage, see Project health and check-ins.