Set the project billing and units

Choose how a project measures effort, which currency it reports in, and which engagement model it's billed under.

Every number a project shows you later (effort on a task, cost on a board, margin in the P&L) is measured in the unit and the currency you set here. Getting these two right before anyone books work means the rollups add up, instead of mixing hours with days or dollars with dong. The billing type then says what kind of engagement this project is, so finance can read the P&L without asking. Here's how to set all of it.

Note: Only a project manager sees the Settings entry in the project menu. If it isn't there, ask the person who manages the project or your app admin.

Step 1: Open the project settings

  • Open the project from Projects or from the service in your sidebar.

  • In the project menu, click Settings.

  • The first card is Measure & currency, and Billing sits right under it.

The Settings entry in the Atlasworks Website Redesign project menu, with the Measure and currency card open

Step 2: Choose the workload unit and the currency

Measure & currency holds three fields:

  • Workload unit: Hours or Days. Effort is summed in this unit on every task, every board and the project total. A studio that books designers by the day picks Days, and a team that logs to the quarter hour picks Hours.

  • Currency: the currency that labels every cost rollup, per task, per board and for the whole project. A project with no currency of its own inherits the workspace default.

  • Hours per day: how many hours make a working day, used to convert between the two units. The default is 8.

Workload unit, Currency and Hours per day in the Measure and currency card
FieldWhat it changes downstream
Workload unitThe unit every booking, task rollup and board total is summed in.
CurrencyThe currency shown on cost, income and margin figures for this project.
Hours per dayThe factor used when a booking in days has to be compared with time logged in hours.

Step 3: Decide whether bookings may use their own unit and currency

Under the three fields is one toggle:

  • Off, it reads Bookings may use their own unit & currency. A booking can be entered in its own unit or currency, and every entry is converted to the project canonical for the rollups.

  • On, it reads Bookings locked to project unit & currency. The Book workload and Add expense dialogs then force the project's unit and currency, and the fields stop being editable.

Click Save to apply the card.

The booking lock toggle and the Save button of the Measure and currency card

Note: Lock the bookings when several people book work on the same project and you want one clean set of numbers. Leave it unlocked when a project genuinely buys in a second currency, for example a vendor invoiced in EUR on a USD project.

Step 4: Pick the billing type

Open the Billing card and choose a Billing type. The type labels the project in the P&L report and in exports. It doesn't change any calculation.

Billing typeUse it when
Not setThe engagement has not been agreed yet.
RetainerThe client pays a recurring fee for an ongoing scope.
Fixed feeOne agreed price for the whole scope.
Time & MaterialsThe client is billed for the effort and the costs actually incurred.
MilestoneRevenue is recognised at agreed milestones. See Record costs and income.
Internal / Non-billableInternal work with no client revenue behind it.

Click Save under the Billing card.

The Billing type list open, showing Not set, Retainer, Fixed fee, Time and Materials, Milestone and Internal / Non-billable

Step 5: Check the result on a money screen

Open Workloads in the project menu. Every booking now reads in the unit and the currency you chose: the Booked column shows the planned effort on the first line and what it costs on the second.

The Workloads list of Atlasworks Website Redesign, with the Booked column showing 12 day and $3,840

The same unit and currency carry into Costs and Incomes, into the Financials card on the project Overview, and into the service P&L report, where the billing type appears as the project's Type.

With the measure set, you're ready to book workloads for the project ✅