Set up your project

Choose the unit and currency your project measures effort in, how it's billed, whether it has a roadmap, and how tasks get reviewed.

A new project already works, but a few decisions make its numbers and its screens match how your studio runs: hours or days, which currency, how the client is billed, and whether a task needs a reviewer before it can be Done. They all live on one page, and each section saves on its own, so you can change one thing without touching the rest.

Note: Only a project owner or an app admin sees Settings in the project rail.

Step 1: Open the project settings

  • Open the project.

  • Click Settings at the bottom of the project rail.

The project rail with Settings at the bottom

Step 2: Set the measure and the currency

Measure & currency decides the units every rollup is reported in.

  • Workload unit: Hours or Days. Effort is summed in this unit on every board and on the project total.

  • Currency: the currency every cost and income rollup is labelled with.

  • Hours per day: how a day converts to hours, and back. Use your studio's working day, for example 8.

  • The toggle underneath decides whether bookings may carry their own unit and currency. Locked, the booking dialogs force the project's unit and currency. Unlocked, entries are converted to the project's for every rollup.

  • Click Save in this section.

Measure and currency with the unit, currency, hours per day, the booking lock and Save

Step 3: Choose the billing type

Billing type labels the project in the P&L report and in exports. It doesn't change any calculation. It simply says what kind of engagement this is:

Billing typeUse it when
RetainerThe client pays a recurring fee for ongoing work
Fixed feeThe scope and the price were agreed up front
Time & MaterialsThe client is billed for the effort actually spent
MilestoneInvoices are raised as milestones are accepted
Internal / Non-billableStudio work with no client invoice

Pick one and click Save.

The Billing section with the Billing type dropdown and Save

Step 4: Turn the roadmap on or off

Roadmap enabled controls the whole roadmap for this project: the Roadmap section in the rail, and the milestone and phase fields on every task.

Turning it off hides all of that. Don't worry, nothing is deleted, and every assignment comes back when you turn it on again. See Roadmap and milestones.

The Roadmap section with the Roadmap enabled toggle

Step 5: Decide whether tasks are reviewed

Enabling task review feature puts a review step in front of Done. When it's on, finishing a task submits it as Pending Review, and only a reviewer or a project manager can approve it. Turning it off keeps the settings, so switching review back on restores them.

With review on, the section also offers:

  • Assigned reviewers: the people who can approve. Project managers can review by default.

  • Enable review SLAs: how long a reviewer has once a task is submitted. Each reviewer gets a reminder due at that point.

  • Also enable reviewing subtasks, with its own SLA and the option to let the person who created a sub-task approve it.

The full walkthrough is in Complete a task and task review.

The Task review section with the review toggle

Step 6: Check the item fields

Item Fields shows the custom fields tasks in this project carry:

  • INHERITED FROM <service>: the fields the service template defines. The project can't remove them, but it can Override whether one is required, important or visible, and Reset to service default afterwards.

  • ADDED BY THIS PROJECT: fields that exist only here. Click New Field to add one.

Item Fields with the inherited list, the project list and the New Field button

All set! ✅ Next, check who can do what in the project: Project team and roles.