Work a deal from its page

Read a deal page from top to bottom and learn where to move the stage, log your work, bring in teammates and close the deal.

A deal page puts everything about one opportunity on a single screen: where it stands in the pipeline, who the customer is, what has been said and done, and who on your team is helping. Once you know what each part is for, you can update a deal in seconds and never go looking for context in email or chat. Here's how to read it, using Daniel's deal Atlasworks – platform rollout as the example.

Open a deal by clicking its card on the board or its row in the Deals table.

Step 1: Find your way around the header and the deal menu

  • Deal menu (left): the pages that belong to this deal.

PageWhat it shows
DealThe deal page described in this article.
CommerceThe quotes, orders, contracts and subscriptions raised for this deal.
NotesOnly the notes from the work stream, with a composer to add one.
EmailsOnly the emails on this deal, with a composer to write one.
MeetingsOnly the meetings logged on this deal.
CallsOnly the calls logged on this deal.
  • Breadcrumb: the pipeline name and the deal name. Click the pipeline name to go back to its board.

  • Won and Lost: close the deal. See Close a deal as won or lost.

  • ⋯ (more actions): everything else you can do to the deal, such as Edit basic, Edit labels, Edit owner, Manage collaborators, Edit attachments, Move to another stage, Move to another pipeline, Enroll into a forecast and Delete. More edit options opens a second list with Edit custom fields, Switch primary contact, Switch primary account, Set expected closed date, Add secondary contact and Edit deal probability.

The deal menu, the breadcrumb, the Won and Lost buttons and the more actions menu

Note: Won, Lost and most edit actions appear only for the deal owner and app admins. So if you can see a deal but don't own it, you'll read the same page without those buttons.

Step 2: Check the stage, probability and expected close

The top of the page repeats the deal's name, labels, value, primary contact and primary account. Under them:

  • Stage bar: every stage of the pipeline. Stages the deal has passed are green, the current one is blue. Click a later stage to move the deal there. See Move a deal through stages.

  • Pipeline › stage: click it to move the deal to another pipeline.

  • Probability: how likely the deal is to close. It follows the stage unless someone set a number for this deal. The small % button next to it edits the number, when the pipeline allows it. See Understanding probability.

  • Exp. close: the date you expect to close. On a deal without one, the link reads Set expected closed date.

The stage bar, the pipeline and stage link, Probability and the expected close date

Step 3: Read the facts in the left column

  • Overview: the Projected value, the status chip (Active, Won or Lost), the Probability and the Pipeline with its stage. The pencil edits the name and value.

  • Forecasts: the forecast periods this deal is enrolled in and its Weighted value (value × probability). Click Enroll in forecast to add it to one. See Forecast a deal.

  • Custom fields: the extra fields your pipeline asks for. The pencil opens them for editing. When the pipeline has none, the card says No custom fields to show.

The Overview, Forecasts and Custom fields cards

Step 4: Plan and log the work in the middle column

  • Action plan: the next steps for this deal. Type in Tasks and press Enter to create a task assigned to you, or add a quick item in Todos and use @ to tag a follower.

  • Work stream: the deal's history, newest first. Use the Note, Email, Call and Meeting tabs to log what happened. Stage moves and other changes are added for you. The chips under the composer filter the stream by type, and Most recent changes the order. See Log activities on a deal.

The Action plan card and the Work stream with its composer and filters

For the Atlasworks deal, the work stream holds the discovery call notes from Daniel, Quinn's note after the demo and the proposal for 250 seats, followed by the stage moves from Discovery to Proposal.

Step 5: Bring in your team in the right column

  • Owner & team: the Deal owner, with a pencil to hand the deal to someone else. Collaborators are teammates who work the deal with you: click Collab to add one, for example Quinn as the solution engineer. Followers are simply kept in the loop: use Add followers to add others, or Follow to follow the deal yourself.

  • Discussion: internal comments about the deal. Customers never see them. Write a comment, attach a file or add an emoji, then click Submit.

The Owner & team card and the Discussion card

Step 6: Scroll down for the customer and the deal's clock

  • Primary contact: the main person at the customer, with their title, phone, email and labels. Click the name to open the contact. Additional contacts lists the other people involved, and + adds one.

  • Primary account: the customer company. Click it to open the account.

  • Deal flows: when the deal was created, the Current stage and when it joined it, the Expected close date, the Deal age and the Inactive days since anyone last worked it. Once the deal is closed, it also shows when it was won or lost and why.

  • Deal insights: how the work on this deal splits between mails, meetings, calls and notes, and when each was last logged.

  • Files: documents attached to the deal. The paperclip adds one.

Primary contact, Primary account, Deal flows, Deal insights and Files

Note: Your admin can give a pipeline its own deal page layout. If your deal page looks different, don't worry: the same cards are there, arranged the way your pipeline needs them.

What to do next

What you wantWhere to go
Move the deal forwardMove a deal through stages
Record a call, meeting or noteLog activities on a deal
Count the deal in a forecastForecast a deal
Close the dealClose a deal as won or lost

💡 Once these cards feel familiar, keeping a deal up to date takes just a few clicks.